10 Elsinore Path
10 Elsinore Path is in New Toronto. It's outside TRCA flood hazard areas and there are 2 planning applications nearby (both under review).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 2 planning applications within 250 m: both under review.
03The building
1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 3 projects from 3 permits
- Deck or porch · completed Jan 14, 2025
Proposed Front Entrance Stairs & Railings Remedial Work- Replacement of wood decking only at landing and new stairs.- Replacement of railings. · Permit 24 215623 - Solar Collector · completed Jul 28, 2026
installation of solar electric system on building room · Permit 11 218665 - Backflow Prevention Devices (Water only) · completed Jun 8, 2026
installation of one backflow prevention device · Permit 10 257464
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M8V, 1 of 202 home tap-water samples (0.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M8V is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 3 samples here (1.5%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
2 active planning applications within 250 m (about a 3-minute walk): both under review. That's about typical for Toronto (the typical address has 1).
- 1124 Birmingham St · 128 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
The project proposal seeks to construct 2 one-storey industrial warehouse and distribution buildings with accessory office. The existing unoccupied three-storey building (Heritage) is proposed to remain and be incorporated into the…File 24 173799 WET 03 SA · submitted Jul 3, 2024 · City record - 2260 Eighth St · 188 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
The project proposal seeks to construct 2 one-storey industrial warehouse and distribution buildings with accessory office. The existing unoccupied three-storey building (Heritage) is proposed to remain and be incorporated into the…File 24 173799 WET 03 SA · submitted Jul 3, 2024 · City record
1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 10 Elsinore Path
Is 10 Elsinore Path in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 10 Elsinore Path?
There are 2 active planning applications within 250 metres (both under review). The closest is at 124 Birmingham St, 128 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 10 Elsinore Path been renovated?
Yes. The City has 3 building permits on record, 1 in the last 5 years. Source: Building Permits.
Is 10 Elsinore Path a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 10 Elsinore Path?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location