Skip to content
My Address in Toronto
Address report

100 Chambers Ave

An address in Weston-Pelham Park, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 0 active development applications and 3 Committee of Adjustment applications within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications3active within 250 m
Flood hazardOutsideTRCA mapping
Carrick AveRockwell AveBlackthorn AveHowick AveTurnberry AveEstoril TerAlentejo StBraga GdnsSilverthorn AveAlgarve CresChambers AveTerceira CrclBenny Stark StUnion StRosethorn AveLavender RdRowntree AveOld Weston Rd123Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (1)
  • Multiple Projects · Permit Issued · Mar 24, 2003
    construct 1 storey and basement addition at rear with deck. also install basement entrance at rear. see committee of adjustments decision. final and binding. · Permit 02 197094 BLD

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA44Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M6N17 of 270 above 0.01 ppmYour area · M6NNon Regulated Lead Sample · Jan 14, 2014 to Aug 13, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    581 Old Weston Rd · 39 m · Committee of Adjustment · Minor variance · Approved
    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition over the existing rear basement walkout. There will be one primary unit and one secondary suite within this dwelling.
    File A0754/23TEY · submitted Sep 1, 2023
  2. 2
    611 R Old Weston Rd · 67 m · Committee of Adjustment · Minor variance · Deferred
    To replace the existing one-storey ancillary building (semi-detached garage) with a new two-storey semi-detached dwelling (with a cantilevered second storey abutting the existing right-of-way). The existing one-storey ancillary building…
    File A1017/23TEY · submitted Nov 28, 2023
  3. 3
    56 Rosethorn Ave · 101 m · Committee of Adjustment · Minor variance · Postponed
    File A0723/26TEY · submitted Sep 30, 2026

Development Applications; Committee of Adjustment Applications · 6 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 20, 2026This addressCollection calendar Friday 1
Next recyclingNovember 13, 2026This addressSolid Waste Collection Schedule
City councillorAlejandra BravoWard 9Councillor_Bravo@toronto.ca · 416-392-7012

05Quick answers about 100 Chambers Ave

Is 100 Chambers Ave in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 100 Chambers Ave?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 100 Chambers Ave?

Collection calendar Friday 1. Next garbage pickup: Nov 20, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

100 Chambers Ave, Toronto — address report · My Address in Toronto