Skip to content
My Address in Toronto
Address report

100 Gloucester St

100 Gloucester St is in Church-Wellesley, in a registered apartment building built in 1960 with 212 units. It's outside TRCA flood hazard areas and there are 17 planning applications nearby (ten under review, five under appeal, one waiting for a hearing date, one other).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • This building scored 96 out of 100 when last evaluated (Sep 29, 2026). That's higher than 74% of evaluated buildings in Toronto.
  • 2 fire code violations in open inspections (most recent opened Aug 14, 2026).
  • 1 open building order from the City.
  • Outside TRCA flood hazard areas.
  • 17 planning applications within 250 m: ten under review, five under appeal, one waiting for a hearing date, one other.
RentSafe score96out of 100
Fire code violations2in open inspections
Applications nearby17active, within 250 m
Flood hazardOutsideTRCA mapping
Church StWellesley StJarvis StSherbourne StDundonald StMonteith StGloucester StIsabella StHayden StCharles StHomewood AveHuntley StEarl PlEarl StCawthra SqLourdes LaneWellesley Pl123456789101112Map data: City of Toronto (Toronto Centreline)Church StWellesley StJarvis StHayden StLinden StDundonald StMonteith StIsabella StGloucester StCharles StHuntley StEarl PlCawthra SqWellesley Pl123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 100 Gloucester St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

01The building

ItemFindingPrecisionSource
RentSafe evaluation96 / 100This addressApartment Building Evaluation · evaluated Sep 29, 2026

RentSafe is the City's inspection program for apartment buildings with 3+ storeys and 10+ units. This building scored 96 out of 100 when last evaluated (Sep 29, 2026). That's higher than 74% of evaluated buildings in Toronto.

Building11 storeys · 212 units · built 1960This addressApartment Building Evaluation
Fire code inspections2 violations in open inspectionsThis addressResidential Fire Inspection Results · last opened Aug 14, 2026
Building orders and notices1 openThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years2 permitsThis addressBuilding Permits · 4 on record

2 building permits in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalRegistered (5 units)This addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Open fire code items (2)
  • 2.2.3.2 Maintenance of closures · opened Dec 4, 2025
  • Requirements for locking, latching and fastening devices · opened Jan 28, 2026
Permit history: 4 projects from 4 permits
  • Garage Repair/Reconstruction · completed Sep 25, 2026
    Localized soffit concrete repairs at 105 Isabella and 100 Gloucester parking garage, and ramp slab replacement and waterproofing at 105 Isabella Street to match existing. · Permit 25 176100
  • Balcony/Guard Repairs · completed Jun 7, 2022
    Proposal to replace section of the balcony concrete slab. Unit 214 · Permit 22 113510
  • Balcony/Guard Repairs · completed Jun 7, 2022
    Proposed concrete repair to existing apartment building balcony on the second floor. · Permit 17 181458
  • Backflow Prevention Devices (Water only) · completed Mar 17, 2023
    Proposal to install a back flow prevention device and expansion tank in parking garage of existing residential apartment building. · Permit 15 114190

02Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4Y0% of tests above Ontario's limitYour area · M4YNon Regulated Lead Sample · 23 tests, May 22, 2014 to Sep 20, 2024

In postal area M4Y, 0 of 23 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. Buildings with more than six units don't have lead service pipes.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

17 active planning applications within 250 m (about a 3-minute walk): ten under review, five under appeal, one waiting for a hearing date, one other. That's more than at 9 in 10 Toronto addresses.

  1. 1
    40 Huntley St · 60 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  2. 2
    38 Huntley St · 72 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  3. 3
    34 Huntley St · 79 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  4. 4
    32 Huntley St · 89 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  5. 5
    30 Huntley St · 96 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  6. 6
    49 Huntley St · 102 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed Official Plan and Zoning By-law Amendment for 59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community spaces, retail, a daycare…
    File 21 227527 STE 13 OZ · submitted Oct 19, 2021 · City record
  7. 7
    112 Isabella St · 105 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  8. 8
    53 Huntley St · 105 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed Official Plan and Zoning By-law Amendment for 59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community spaces, retail, a daycare…
    File 21 227527 STE 13 OZ · submitted Oct 19, 2021 · City record
  9. 9
    114 Isabella St · 107 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  10. 10
    116 Isabella St · 107 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    To permit the construction of two buildings, with building heights of 56 and 60 storeys and approximately 1,362 dwelling units, and a POPS. The project retains portions of the existing heritage listed buildings at 122-124 Isabella Street,…
    File 25 265168 STE 13 SA · submitted Dec 11, 2025 · City record
  11. 11
    55 Huntley St · 107 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed Official Plan and Zoning By-law Amendment for 59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community spaces, retail, a daycare…
    File 21 227527 STE 13 OZ · submitted Oct 19, 2021 · City record
  12. 12
    47 Huntley St · 109 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed Official Plan and Zoning By-law Amendment for 59-storey (west tower) and 48-storey (east tower) mixed-use buildings that will include: affordable rental units, rental replacement units, community spaces, retail, a daycare…
    File 21 227527 STE 13 OZ · submitted Oct 19, 2021 · City record
Short-term rentals nearby13 registered homesWithin 250 mShort Term Rentals Registration

13 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

04City services

ItemFindingPrecisionSource
Garbage daySee calendarThis addressSolid Waste Collection Schedule
City councillorChris MoiseWard 13Councillor_Moise@toronto.ca · 416-392-7903

05Quick answers about 100 Gloucester St

Is 100 Gloucester St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

Does 100 Gloucester St have open fire code violations?

Yes. 2 violations are recorded in open fire inspections, the most recent opened Aug 14, 2026. Source: Residential Fire Inspection Results.

What is being built near 100 Gloucester St?

There are 17 active planning applications within 250 metres (ten under review, five under appeal, one waiting for a hearing date, one other). The closest is at 40 Huntley St, 60 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 100 Gloucester St been renovated?

Yes. The City has 4 building permits on record, 2 in the last 5 years. Source: Building Permits.

Is 100 Gloucester St a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Corner of Jarvis St. and Gloucester St., looking south-west
1972 · 60 m awayCorner of Jarvis St. and Gloucester St., looking south-westCity of Toronto Archives, Fonds 2032, Series 841, File 49, Item 23
Corner of Jarvis St. and Gloucester St., looking south-west
1972 · 60 m awayCorner of Jarvis St. and Gloucester St., looking south-westCity of Toronto Archives, Fonds 2032, Series 841, File 3, Item 19
Corner of Jarvis St. and Earl Pl., looking north-east
1972 · 60 m awayCorner of Jarvis St. and Earl Pl., looking north-eastCity of Toronto Archives, Fonds 2032, Series 841, File 49, Item 21
Crowther, James, house, Jarvis St., n.w. cor. Gloucester St.?
1881 · 60 m awayCrowther, James, house, Jarvis St., n.w. cor. Gloucester St.? Courtesy of Toronto Public Library
Corner of Jarvis St. and Earl Pl., looking south-east
1972 · 60 m awayCorner of Jarvis St. and Earl Pl., looking south-eastCity of Toronto Archives, Fonds 2032, Series 841, File 49, Item 22
Corner of Jarvis St. and Gloucester St., looking south-west
1972 · 60 m awayCorner of Jarvis St. and Gloucester St., looking south-westCity of Toronto Archives, Fonds 2032, Series 841, File 3, Item 18
Corner of Jarvis St. and Gloucester St., looking north-west
1972 · 60 m awayCorner of Jarvis St. and Gloucester St., looking north-westCity of Toronto Archives, Fonds 2032, Series 841, File 49, Item 20
Jarvis St., looking s. from s. of Isabella St.
1956 · 97 m awayJarvis St., looking s. from s. of Isabella St. Courtesy of Toronto Public Library
Corner of Jarvis St. and Isabella St., looking north-west
1972 · 97 m awayCorner of Jarvis St. and Isabella St., looking north-westCity of Toronto Archives, Fonds 2032, Series 841, File 3, Item 14

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

100 Gloucester St, Toronto M4Y: permits, flood risk and what's planned nearby · My Address in Toronto