107 Perth Ave
107 Perth Ave is in Junction-Wallace Emerson. It's outside TRCA flood hazard areas and there are no active planning applications nearby.
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 2 permits
- Interior Alterations · completed Aug 6, 2019
Proposal for Interior Alteration to a semi-detached house, to convert two apartments into a single family house. Includes new kitchen, new laundry on the second floor, no proposed work in the… · 2 permits in this project (such as building, plumbing and heating) · Permit 19 137870
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6P, 9 of 657 home tap-water samples (1.4%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6P is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 20 samples here (3.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
No active planning applications within 250 m (about a 3-minute walk). Most Toronto addresses (64%) have at least one application nearby.
11 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 107 Perth Ave
Is 107 Perth Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 107 Perth Ave?
There are no active development or Committee of Adjustment applications within 250 metres. Source: Development Applications; Committee of Adjustment Applications.
Has 107 Perth Ave been renovated?
Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 107 Perth Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 107 Perth Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives








Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location