Skip to content
My Address in Toronto
Address report

112 Arjay Cres

112 Arjay Cres is in Bridle Path-Sunnybrook-York Mills. It's outside TRCA flood hazard areas and there are 11 planning applications nearby (six under review, four approved, one hearing on Nov 12).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 11 planning applications within 250 m: six under review, four approved, one hearing on Nov 12.
Building permits1in the last 5 years
Applications nearby11active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11garbage, green bin and yard waste
Bayview AveBayview Ridge1234567891011Map data: City of Toronto (Toronto Centreline)Bayview AveBayview Ridge Cres1234567891011Map data: City of Toronto (Toronto Centreline)
The red dot is 112 Arjay Cres. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 7 on record

1 building permit in the last 5 years. Together they added 1 new home. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 4 projects from 7 permits
  • Back Water Valve (Sewer only) · completed Nov 15, 2024
    Back water valve · Permit 24 236998
  • Accessory Building(s) · completed Dec 11, 2019
    Revision #01 - Adding an additional pergola.Proposal to construct a rear yard cabana. · Permit 18 256809
  • Accessory Building(s) · completed Dec 13, 2019
    Proposal to construct a rear yard cabana. · Permit 18 184830
  • New Building · completed Jun 5, 2026
    New 2 storey house · 4 permits in this project (such as building, plumbing and heating) · Permit 04 179151

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M2L4.8% of tests above Ontario's limitYour area · M2LNon Regulated Lead Sample · 21 tests, May 23, 2014 to Oct 5, 2022

In postal area M2L, 1 of 21 home tap-water samples (4.8%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (4.8%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

11 active planning applications within 250 m (about a 3-minute walk): six under review, four approved, one hearing on Nov 12. That's more than at 9 in 10 Toronto addresses.

Nov
12
Nearby · 98 mCommittee of Adjustment hearing: 2445 Bayview Ave10:00 a.m. · Committee of Adjustment · Minor variance · File A0344/26NY
  1. 1
    2445 Bayview Ave · 98 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    A public hearing is set for Nov 12, 2026 at 10:00 a.m.. Neighbours can send comments or speak at the hearing.

    To construct a six-storey apartment building containing 70 dwelling units.
    File A0344/26NY · submitted Oct 2, 2026
  2. 2
    1 Tudor Gt · 113 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    INACTIVE The development of 7 - three storey townhouses with an FSI of 1.43. The townhouses will front onto Bayview Avenue with the end-corner unit also having an entranceway fronting onto Tudor Gate. Parking is proposed at the rear of…
    File 19 130429 NNY 15 SA · submitted Mar 25, 2019 · City record
  3. 3
    2472 Bayview Ave · 119 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Control Application contemplates the construction of a 6-storey residential apartment building comprising a total of 60 condominium units. The unit mix includes 22 one-bedroom units (36.7%), 25 two-bedroom units (41.7%), and 13…
    File 26 153706 NNY 15 SA · submitted May 1, 2026 · City record
  4. 4
    2452 Bayview Ave · 120 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed development of a 6-storey retirement residence containing a total of 141 suites.
    File 26 207664 NNY 15 SA · submitted Jul 23, 2026 · City record
  5. 5
    71 Arjay Cres · 143 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Nov 10, 2016.

    To legalize and permit the existing accessory structure.
    File A0852/16NY · submitted Sep 29, 2016
  6. 6
    2450 Bayview Ave · 155 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed development of a 6-storey retirement residence containing a total of 141 suites.
    File 26 207664 NNY 15 SA · submitted Jul 23, 2026 · City record
  7. 7
    197 Valley Rd · 173 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Control Application proposes the development of a 6-storey residential building. The building will provide a total of 60 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Valley…
    File 26 255672 NNY 15 SA · submitted Oct 16, 2026 · City record
  8. 8
    92 Arjay Cres · 182 m away
    Committee of Adjustment · Consent (severance): permission to split a lot or change property lines

    The Committee of Adjustment approved it on Jun 9, 2022.

    To obtain consent to sever the property into two residential lots. Application numbers B0009/21NY, A0095/22NY & A0096/22NY will be considered jointly.
    File B0009/22NY · submitted Jan 31, 2022
  9. 9
    78 Arjay Cres · 219 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Jul 13, 2023.

    Proposal to construct a new dwelling.
    File A0286/23NY · submitted May 30, 2023
  10. 10
    1 Country Lane · 232 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Control Application proposes the development of a 6-storey residential building. The building will provide a total of 70 units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom. A paved access from Country Lane along the east…
    File 25 236994 NNY 15 SA · submitted Oct 8, 2025 · City record
  11. 11
    196 Valley Rd · 249 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Three storey townhouse development containing 6 dwelling units facing Bayview Avenue. Vehicular parking to the townhouses will be accessed via a rear driveway from Valley Rd. Each townhouse will have an integral double car garage. In…
    File 19 164763 NNY 15 SA · submitted Jun 3, 2019 · City record
Short-term rentals nearby0 registered homesWithin 250 mShort Term Rentals Registration

No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorRachel Chernos Lin Ward 15Councillor_ChernosLin@toronto.ca · 416-395-6408

05Quick answers about 112 Arjay Cres

Is 112 Arjay Cres in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 112 Arjay Cres?

There are 11 active planning applications within 250 metres (six under review, four approved, one hearing on Nov 12). The closest is at 2445 Bayview Ave, 98 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 112 Arjay Cres been renovated?

Yes. The City has 7 building permits on record, 1 in the last 5 years. Source: Building Permits.

Is 112 Arjay Cres a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 112 Arjay Cres?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

112 Arjay Cres, Toronto M2L: permits, flood risk and what's planned nearby · My Address in Toronto