Skip to content
My Address in Toronto
Address report

115 Tenth St

An address in New Toronto, outside TRCA flood and shoreline hazard areas, with 5 active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • 1 open building order or notice.
  • Outside TRCA flood and shoreline hazard areas.
  • 5 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications6active within 250 m
Flood hazardOutsideTRCA mapping
Sixth StMorrison StEleventh StEighth StSeventh StNinth StTenth StTwelfth StThirteenth StJackson RdCoin StGarnett Janes RdLake Shore Blvd WIslington Ave123456Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and notices1 openThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years4 permitsThis addressBuilding Permits · 5 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (5)
  • Multiple Projects · Revision Issued · Jun 26, 2026
    Revision 02: Proposed front porch.Rev 01: new second floor deck on existing carport roof added to scopeProposal for interior renovations and additon, convert SFD to duplex. · Permit 25 193487 BLD
  • Multiple Projects · Cancelled · Mar 16, 2026
    Rev 01: new second floor deck on existing carport roof added to scopeProposal for interior renovations and additon, convert SFD to duplex. · Permit 25 193487 BLD
  • Building Permit Related(MS) · Inspection · Feb 12, 2026
    HVAC - Proposal for interior renovations and additon, convert SFD to duplex. · Permit 25 193487 HVA
  • Multiple Projects · Inspection · Dec 29, 2025
    Proposal for interior renovations and additon, convert SFD to duplex. · Permit 25 193487 BLD
  • Building Permit Related(PS) · Inspection · Dec 29, 2025
    Plumbing - Proposal for interior renovations and a rear extension to existing SFD. · Permit 25 193487 PLB

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA53Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M8V1 of 116 above 0.01 ppmYour area · M8VNon Regulated Lead Sample · Apr 3, 2014 to Sep 7, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    99 Birmingham St · 152 m · Official Plan / Rezoning · OMB Appeal
    The proposed development consists of a 26-storey mixed use building, containing 352 dwelling units with retail uses at-grade. The proposed net density is 8.83 times the area of the lot. The total building height is 80.47 metres, exclusive…
    File 23 228917 WET 03 OZ · submitted Nov 23, 2023 · City record
  2. 2
    2970 Lake Shore Blvd W · 168 m · Official Plan / Rezoning · OMB Appeal
    Proposal for a 9-storey (28.7 m in height including mechanical penthouse) mixed use building containing 95 residential units and 485 sq. m of commercial gross floor area at grade. A total GFA of 8,683 sq. m is proposed, resulting in an…
    File 19 146505 WET 03 OZ · submitted Apr 29, 2019 · City record
  3. 3
    210 Islington Ave · 170 m · Official Plan / Rezoning · OMB Appeal
    The proposed development consists of a 26-storey mixed use building, containing 352 dwelling units with retail uses at-grade. The proposed net density is 8.83 times the area of the lot. The total building height is 80.47 metres, exclusive…
    File 23 228917 WET 03 OZ · submitted Nov 23, 2023 · City record
  4. 4
    2950 Lake Shore Blvd W · 171 m · Official Plan / Rezoning · OMB Appeal
    Proposal for a 9-storey (28.7 m in height including mechanical penthouse) mixed use building containing 95 residential units and 485 sq. m of commercial gross floor area at grade. A total GFA of 8,683 sq. m is proposed, resulting in an…
    File 19 146505 WET 03 OZ · submitted Apr 29, 2019 · City record
  5. 5
    124 Birmingham St · 186 m · Site Plan · Under Review
    The project proposal seeks to construct 2 one-storey industrial warehouse and distribution buildings with accessory office. The existing unoccupied three-storey building (Heritage) is proposed to remain and be incorporated into the…
    File 24 173799 WET 03 SA · submitted Jul 3, 2024 · City record
  6. 6
    90 Tenth St · 118 m · Committee of Adjustment · Minor variance · Prepare Notice
    To construct a three-storey front addition and a second and third storey addition above the existing dwelling.
    File A535/16EYK · submitted Jun 28, 2016

Development Applications; Committee of Adjustment Applications · 2 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 11, 2026This addressCollection calendar Wednesday 2
Next recyclingNovember 18, 2026This addressSolid Waste Collection Schedule
City councillorAmber MorleyWard 3Councillor_Morley@toronto.ca · 416-397-9273

05Quick answers about 115 Tenth St

Is 115 Tenth St in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 115 Tenth St?

5 active development applications within 250 metres, the closest at 99 Birmingham St (152 m). Source: Development Applications.

When is garbage day at 115 Tenth St?

Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

115 Tenth St, Toronto — address report · My Address in Toronto