12 Fallingbrook Wds
An address in Birchcliffe-Cliffside, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (6)
- Building Permit Related(MS) · Inspection · May 7, 2024
HVAC - Proposal for altering existing dwelling by lowering the basement, interior alterations and constructing a 3rd floor addition, rear addition, and 1-storey front addition · Permit 23 160779 HVA - Multiple Projects · Revision Issued · May 1, 2024
REV - Revision to Issued Permit 23 160779 BLD 00 SR: · Permit 23 160779 BLD - Building Permit Related (DR) · Inspection · Aug 18, 2023
Drain - Proposal for altering existing dwelling by lowering the basement, interior alterations and constructing a 3rd floor addition, rear addition, and 1-storey front addition · Permit 23 160779 DRN - Multiple Projects · Inspection · Aug 8, 2023
Proposal for altering existing dwelling by lowering the basement, interior alterations and constructing a 3rd floor addition, rear addition, and 1-storey front addition · Permit 23 160779 BLD - Building Permit Related(PS) · Inspection · Aug 8, 2023
Plumbing - Proposal for altering existing dwelling by lowering the basement, interior alterations and constructing a 3rd floor addition, rear addition, and 1-storey front addition · Permit 23 160779 PLB - Multiple Projects · Closed · Oct 8, 2008
proposed 2 car attached front garage · Permit 08 183272 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 1 registered short-term rentals within 250 m.
04City services
05Quick answers about 12 Fallingbrook Wds
Is 12 Fallingbrook Wds in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 12 Fallingbrook Wds?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 12 Fallingbrook Wds?
Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location