129 Highfield Rd
129 Highfield Rd is in Greenwood-Coxwell. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (one under review, one approved, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: one under review, one approved, one waiting for a hearing date.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 3 projects from 3 permits
- Back Water Valve (Sewer only) · completed Sep 16, 2019
Proposal to install a back water valve. · Permit 19 220718 - Porch · inspection · issued Aug 16, 2016
Proposal to construct a front porch with roof above · Permit 16 201575 - Garage · inspection · issued May 31, 2011
Proposed detached garage at rear. · Permit 11 206306
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4L, 10 of 667 home tap-water samples (1.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4L is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 40 samples here (6.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): one under review, one approved, one waiting for a hearing date. That's about typical for Toronto (the typical address has 1).
- 11400 Gerrard St E · 98 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Application to construct a 7 storey (27.2 metres including mechanical penthouse) mixed-use building with 19 rental dwelling units and two commercial units. A total of gross floor area of 1,522.3 square metres is proposed,…File 22 140739 STE 14 SA · submitted May 2, 2022 · City record - 21295 Gerrard St E · 227 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City Council approved it.
This application proposes to amend the Zoning By-law to permit a 12-storey residential building containing 282 residential units, 1271 square metres of GFA of retail on the ground floor, 51 vehicle parking spaces, and 322 bicycle parking…File 23 140447 STE 14 OZ · submitted May 2, 2023 · City record - 334 Hiawatha Rd · 246 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a new two-storey detached dwelling with a front porch and stairs, a front integral garage, a front second storey bay window, a south side entrance to the garage, a rear ground floor deck with stairs, and a rear basement…File A0171/24TEY · submitted Feb 14, 2024
4 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: recycling and green bin. November 17: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 129 Highfield Rd
Is 129 Highfield Rd in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 129 Highfield Rd?
There are 3 active planning applications within 250 metres (one under review, one approved, one waiting for a hearing date). The closest is at 1400 Gerrard St E, 98 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 129 Highfield Rd been renovated?
Yes. The City has 3 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 129 Highfield Rd a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 129 Highfield Rd?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 17, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives


Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location