130 Sears St

130 Sears St is in Greenwood-Coxwell. It's inside TRCA flood hazard areas, with 10 planning applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Inside a TRCA flood or shoreline hazard area.
  • 1 active development application and 9 Committee of Adjustment applications within 250 m.
Building permits0in the last 5 years
Applications nearby10active, within 250 m
Flood hazardInsideTRCA mapping
HeritageNot listedCity Heritage Register
Queen StLeslie StEastern AveLaing StConnaught AveAlton AveMinto StBrick CrtKnox AveGreenwood AveSears StHastings Ave12345678910Map data: City of Toronto (Toronto Centreline)Eastern AveQueen StLaing StAlton AveMinto StBrick CrtKnox AveVancouver AveGreenwood AveSears St12345678910Map data: City of Toronto (Toronto Centreline)
The red dot is 130 Sears St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Most recent permits (1 of 1)
  • Demolition · Closed · Jan 25, 2018
    Proposal to demolish existing single family dwelling-detached (2-storey metal clad building). · Permit 17 239068 DEM

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardInsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaInside: TRCA permit may be needed for workThis addressTRCA Regulation mapping 2025
Lead in tap-water tests, postal area M4L1.7% of tests above Ontario's limitYour area · M4LNon Regulated Lead Sample · 592 tests, Jan 15, 2014 to Sep 18, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

Dec
31
Nearby · 0 mCommittee of Adjustment hearing: 130 Sears StTBD · Committee of Adjustment · Minor variance · File A0619/23TEY
Dec
31
Nearby · 0 mCommittee of Adjustment hearing: 130 Sears StTBD · Committee of Adjustment · Minor variance · File A0616/23TEY
Dec
31
Nearby · 0 mCommittee of Adjustment hearing: 130 Sears StTBD · Committee of Adjustment · Minor variance · File A0615/23TEY
Dec
31
Nearby · 0 mCommittee of Adjustment hearing: 130 Sears StTBD · Committee of Adjustment · Consent (severance) · File B0045/20TEY
Dec
31
Nearby · 0 mCommittee of Adjustment hearing: 130 Sears StTBD · Committee of Adjustment · Minor variance · File A0617/23TEY
Dec
31
Nearby · 0 mCommittee of Adjustment hearing: 130 Sears StTBD · Committee of Adjustment · Minor variance · File A0618/23TEY
  1. 1
    130 Sears St · 0 m away
    Committee of Adjustment · Minor variance
    To construct a new three-storey detached building (fourplex) with a basement, a side (west) covered porch, a rear basement walkout, as well as side (west) balconies and rear decks with staircases located on the first, second and third…
    File A0619/23TEY · submitted Mar 20, 2023
  2. 2
    130 Sears St · 0 m away
    Committee of Adjustment · Minor variance
    To construct a new three-storey detached building (fourplex) with a basement, a front basement walkout, front balconies and rear decks with staircases located on the first, second and third levels, and a rear covered porch. Also, to…
    File A0616/23TEY · submitted Mar 20, 2023
  3. 3
    130 Sears St · 0 m away
    Committee of Adjustment · Minor variance
    To construct a new three-storey detached building (fourplex) with a basement, a front basement walkout, front balconies and rear decks with staircases located on the first, second and third levels, and a rear covered porch. Also, to…
    File A0615/23TEY · submitted Mar 20, 2023
  4. 4
    130 Sears St · 0 m away
    Committee of Adjustment · Consent (severance)
    To obtain consent to sever the property into five undersized residential lots (two lots fronting onto Sears Street, three lots fronting onto Memory Lane, and each lot containing a houseplex of four residential dwelling units). Also, to…
    File B0045/20TEY · submitted Mar 12, 2020
  5. 5
    130 Sears St · 0 m away
    Committee of Adjustment · Minor variance
    To construct a new three-storey detached building (fourplex) with a basement, a front basement walkout, front balconies and rear decks with staircases located on the first, second and third levels, and a rear covered porch. Also, to…
    File A0617/23TEY · submitted Mar 20, 2023
  6. 6
    130 Sears St · 0 m away
    Committee of Adjustment · Minor variance
    To construct a new three-storey detached building (fourplex) with a basement, a side (east) covered porch, a rear basement walkout, as well as side (east) balconies and rear decks with staircases located on the first, second and third…
    File A0618/23TEY · submitted Mar 20, 2023
  7. 7
    870 Eastern Ave · 64 m away
    Committee of Adjustment · Minor variance
    To convert the existing two-storey semi-detached dwelling into a fiveplex by constructing a complete two-storey addition, a rear four-storey addition along the west and north walls, a partially covered front porch with stairs, a rear…
    File A0816/25TEY · submitted Oct 31, 2025
  8. 8
    109 Knox Ave · 94 m away
    Committee of Adjustment · Minor variance
    To alter the existing two-storey detached dwelling by constructing complete third and fourth storey additions. There will be rear (east) exterior landings and stairs located at the first, second, and third storeys as well as a rear (east)…
    File A0033/24TEY · submitted Jan 9, 2024
  9. 9
    25 Hiltz Ave · 212 m away
    Committee of Adjustment · Minor variance
    To permit and maintain the existing front (west) staircase and platform (leading to the front enclosed porch) that was partially constructed beyond an authorized building permit (Permit No.19 229066 BLD 00 SR). The existing front enclosed…
    File A0941/25TEY · submitted Dec 18, 2025
  10. 10
    80 Knox Ave · 246 m away
    Site Plan
    Site Plan Approval for a 12-storey mixed-use building having a non-residential gross floor area of 268.20 square metres, and a residential gross floor area of 13,417.80 square metres. 167 rental dwelling units are proposed.
    File 22 141897 STE 14 SA · submitted May 4, 2022 · City record
Short-term rentals nearby7 registered homesWithin 250 mShort Term Rentals Registration

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage dayNovember 17, 2026This addressSolid Waste Collection Schedule
City councillorPaula FletcherWard 14councillor_fletcher@toronto.ca · 416-392-4060

05Quick answers about 130 Sears St

Is 130 Sears St in a flood plain?

Yes. It is inside a TRCA flood or shoreline hazard area. Source: TRCA Regulation mapping 2025.

What is being built near 130 Sears St?

1 active development application within 250 metres, the closest at 80 Knox Ave (246 m). Source: Development Applications.

When is garbage day at 130 Sears St?

Collection calendar Tuesday 1. Next garbage pickup: Nov 17, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Concrete pavement, Queen St East, west of Hiltz, (Way Department)
1934 · 122 m awayConcrete pavement, Queen St East, west of Hiltz, (Way Department)City of Toronto Archives, Fonds 16, Series 71, Item 10688
"Maple Leaf Forever" tree, Laing Street, looking north to Queen Street East
1950 · 133 m away"Maple Leaf Forever" tree, Laing Street, looking north to Queen Street EastCity of Toronto Archives, Fonds 492, Item 281
Laing St., w. side, looking n. to Queen St. E.
1954 · 133 m awayLaing St., w. side, looking n. to Queen St. E. Courtesy of Toronto Public Library
Concrete paving in track allowance, Queen St East, Leslie to Greenwood, looking west, from Hiltz Avenue, (Way Department)
1937 · 138 m awayConcrete paving in track allowance, Queen St East, Leslie to Greenwood, looking west, from Hiltz Avenue, (Way Department)City of Toronto Archives, Fonds 16, Series 71, Item 11826
Concrete pavement in track allowance, Queen St East, Leslie St to Greenwood Ave, looking east, from Laing, (Way Department)
1937 · 151 m awayConcrete pavement in track allowance, Queen St East, Leslie St to Greenwood Ave, looking east, from Laing, (Way Department)City of Toronto Archives, Fonds 16, Series 71, Item 11825
1367 Queen Street East
1939 · 155 m away1367 Queen Street EastCity of Toronto Archives, Fonds 200, Series 372, Subseries 1, Item 1458
View of Queen Street East at Greenwood Avenue
1981 · 162 m awayView of Queen Street East at Greenwood AvenueCity of Toronto Archives, Fonds 1526, File 75, Item 102
1395 Queen St. E., southside 1986 East End Garden and Homeware Centre
1986 · 207 m away1395 Queen St. E., southside 1986 East End Garden and Homeware Centre Courtesy of Toronto Public Library
Queen Street east at Hastings Avenue
1910 · 232 m awayQueen Street east at Hastings AvenueCity of Toronto Archives, Fonds 1231, Item 2057

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

130 Sears St, Toronto M4L: permits, flood risk and what's planned nearby · My Address in Toronto