130 Simpson Ave
130 Simpson Ave is in North Riverdale. It added a laneway suite in 2026, it's outside TRCA flood hazard areas and there is 1 planning application nearby (approved).
Data as of Nov 8, 2026 · Every item lists its source
- Added a laneway suite (completed Jul 2026).
- Outside TRCA flood hazard areas.
- 1 planning application within 250 m: approved.
03The building
6 building permits in the last 5 years, for 2 projects. This includes a laneway suite, completed Jul 2026. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 5 projects from 11 permits
- Addition · completed Jul 3, 2026
Proposed Scope of changes - rear addition foundation has been inset 16" and the joists are now to cantilever. Exterior walls of both floors of the addition are now to be built to the… · 3 permits in this project (such as building, plumbing and heating) · Permit 24 247708 - Laneway suiteNew home · completed Jul 3, 2026
Proposal to construct a new two storey Laneway Suite. · 3 permits in this project (such as building, plumbing and heating) · Permit 24 154728 - Deck or porch · completed Jun 29, 2026
Proposal for a new porch and window at the front of an existing 2 storey SFD-semi dwelling. · Permit 19 194099 - Underpinning · completed Apr 9, 2018
proposal to underpin the basement. interior work was approved in a pervious permit (15 124430) · Permit 15 183116 - Interior Alterations · completed Apr 9, 2018
Permit for interior alterations to Basement, 2nd, & 3rd Floors of existing Single Family Detached Dwelling. · 3 permits in this project (such as building, plumbing and heating) · Permit 15 124430
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4K, 6 of 527 home tap-water samples (1.1%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4K is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 16 samples here (3.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
1 active planning application within 250 m (about a 3-minute walk): approved. That's about typical for Toronto (the typical address has 1).
- 1165 Langley Ave · 208 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Dec 6, 2023.
To alter the existing three-storey detached dwelling by constructing a rear two-storey addition with a ground floor deck and stairs,a rear and sides third storey addition with a rear third storey deck,a front basement walkout,a partial…File A0911/23TEY · submitted Oct 11, 2023
9 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 12: recycling and green bin. November 19: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 130 Simpson Ave
Is 130 Simpson Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 130 Simpson Ave?
There is 1 active planning application within 250 metres (approved). The closest is at 165 Langley Ave, 208 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 130 Simpson Ave been renovated?
Yes. The City has 11 building permits on record, 6 in the last 5 years. They include a laneway suite. Source: Building Permits.
Is 130 Simpson Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 130 Simpson Ave?
Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives




Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location