131 Collier St is in Rosedale-Moore Park, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (three under appeal, two approved).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • It is listed on the Heritage Register, which flags heritage value without full designation.
  • Outside TRCA flood hazard areas.
  • 5 planning applications within 250 m: three under appeal, two approved.
Building permits0in the last 5 years
Applications nearby5active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11recycling and green bin
Church StRosedale Valley RdPark RdYonge StBloor StDavenport RdMount Pleasant RdTed Rogers WayCumberland StCollier StAsquith AveYorkville AveReynolds StScollard StHuntley St12345Map data: City of Toronto (Toronto Centreline)Church StRosedale Valley RdPark RdBloor StHayden StRosedale RdCollier StAsquith Ave12345Map data: City of Toronto (Toronto Centreline)
The red dot is 131 Collier St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 0 on record

The City has no building permits on record for this address. About 9 in 10 Toronto addresses also had none in the last 5 years.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusListedThis addressHeritage Register

It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition.

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4W1.2% of tests above Ontario's limitYour area · M4WNon Regulated Lead Sample · 82 tests, Apr 27, 2014 to Mar 17, 2026

In postal area M4W, 1 of 82 home tap-water samples (1.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4W is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (6.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

5 active planning applications within 250 m (about a 3-minute walk): three under appeal, two approved. That's more than at most Toronto addresses (the typical address has 1).

  1. 1
    820 Church St · 147 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Sep 18, 2024.

    To alter the development standards for a 38-storey hotel building (as approved under Site Specific Zoning By-law 300-2023) by increasing the non-residential gross floor area, building height, and mechanical penthouse height. The new…
    File A0616/24TEY · submitted Jul 9, 2024
  2. 2
    50 Park Rd · 161 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…
    File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
  3. 3
    40 Park Rd · 182 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…
    File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
  4. 4
    38 Park Rd · 200 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…
    File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
  5. 5
    2 Elm Ave · 220 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    Draft Plan of Condominium for 819 units.
    File 21 214202 STE 11 CD · submitted Sep 17, 2021 · City record
Short-term rentals nearby15 registered homesWithin 250 mShort Term Rentals Registration

15 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 131 Collier St

Is 131 Collier St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 131 Collier St?

There are 5 active planning applications within 250 metres (three under appeal, two approved). The closest is at 820 Church St, 147 m away. Source: Development Applications; Committee of Adjustment Applications.

Is 131 Collier St a heritage property?

Yes. It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition. Source: Heritage Register.

When is garbage day at 131 Collier St?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

60-62 Asquith Avenue — Church Street Extension
1930 · 61 m away60-62 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 908
Church Street extension, wrecking on Asquith Avenue
1931 · 61 m awayChurch Street extension, wrecking on Asquith AvenueCity of Toronto Archives, Fonds 1266, Item 23219
68-70 Asquith Avenue — Church Street Extension
1930 · 61 m away68-70 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 910
64-66 Asquith Avenue — Church Street Extension
1930 · 61 m away64-66 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 907
52-54 Asquith Avenue — Church Street Extension
1930 · 61 m away52-54 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 912
Church Street extension, wrecking on Asquith Avenue
1931 · 61 m awayChurch Street extension, wrecking on Asquith AvenueCity of Toronto Archives, Fonds 1266, Item 23218
Church Street extension, from Asquith Avenue, looking south
1931 · 61 m awayChurch Street extension, from Asquith Avenue, looking southCity of Toronto Archives, Fonds 1266, Item 23220
56-58 Asquith Avenue — Church Street Extension
1930 · 61 m away56-58 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 905
81-83 Asquith Avenue — Church Street Extension
1930 · 61 m away81-83 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 909

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

131 Collier St, Toronto M4W: permits, flood risk and what's planned nearby · My Address in Toronto