An address in Humber Summit, outside TRCA flood and shoreline hazard areas, with 15 active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 15 active development applications and 0 Committee of Adjustment applications within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications15active within 250 m
Flood hazardOutsideTRCA mapping
Toryork DrMilvan DrPlunkett RdMuir AveKnox AveSan Gabriele PlCabana DrOliti CrtAnthia DrMadonna GdnsThorold GtIslington AveMillwick Dr123456789101112Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (1)
  • Special Ventilation System · Closed · Jan 13, 2017
    install protex L3000 wet chemical fire suppression system per ULC/ORD-C1254.6-95 as per order of City of Toronto Fire Services · Permit 16 252960 MSA

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA12Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M9L0 of 3 above 0.01 ppmYour area · M9LNon Regulated Lead Sample · Nov 13, 2019 to Mar 5, 2020

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    30 St. Gaspar Crt · 109 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  2. 2
    28 St. Gaspar Crt · 110 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  3. 3
    26 St. Gaspar Crt · 111 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  4. 4
    24 St. Gaspar Crt · 113 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  5. 5
    22 St. Gaspar Crt · 115 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  6. 6
    20 St. Gaspar Crt · 116 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  7. 7
    18 St. Gaspar Crt · 118 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  8. 8
    16 St. Gaspar Crt · 120 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  9. 9
    14 St. Gaspar Crt · 123 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  10. 10
    12 St. Gaspar Crt · 125 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  11. 11
    10 St. Gaspar Crt · 128 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record
  12. 12
    8 St. Gaspar Crt · 131 m · Official Plan / Rezoning · Council Approved
    The proposal is for six blocks of stacked, back-to-back townhouses containing 151 units
    File 17 271641 WET 07 OZ · submitted Dec 5, 2017 · City record

Development Applications; Committee of Adjustment Applications · 5 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 18, 2026This addressCollection calendar Wednesday 1
Next recyclingNovember 11, 2026This addressSolid Waste Collection Schedule
City councillorAnthony PerruzzaWard 7councillor_perruzza@toronto.ca · 416-338-5335

05Quick answers about 140 Millwick Dr

Is 140 Millwick Dr in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 140 Millwick Dr?

15 active development applications within 250 metres, the closest at 30 St. Gaspar Crt (109 m). Source: Development Applications.

When is garbage day at 140 Millwick Dr?

Collection calendar Wednesday 1. Next garbage pickup: Nov 18, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.