154 King St
154 King St is in Weston. It's outside TRCA flood hazard areas, with 3 planning applications within 250 metres.
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 3 Committee of Adjustment applications within 250 m.
03The building
Most recent permits (5 of 5)
- Multiple Projects · Revision Issued · Jan 29, 2020
Revision - Roof structure change, proposed beams and existing chimney to remain · Permit 18 197248 BLD - Building Permit Related(MS) · Revocation Pending · Aug 9, 2018
HVAC - Proposal for new addition and interior alterations at basement · Permit 18 197248 HVA - Multiple Projects · Inspection · Aug 8, 2018
Proposal for new addition and interior alterations at basement · Permit 18 197248 BLD - Building Permit Related(PS) · Inspection · Aug 8, 2018
Plumbing - Proposal for new addition and interior alterations at basement · Permit 18 197248 PLB - Piping: SFD/Semi · Cancelled · Mar 26, 2010
Replacement of domestic water service line. · Permit 10 140057 PSA
04Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
- 1167 Church St · 67 m awayCommittee of Adjustment · Consent (severance)To obtain consent to sever the lot into two undersized residential lots and to create an easement/ right-of-way.File B0026/25EYK · submitted Jun 13, 2025
- 2137 Church St · 149 m awayCommittee of Adjustment · Minor varianceTo alter the development standards (as approved under Site Specific Zoning By-law 1246-2022(OLT) for a new 54-storey mixed-use building, by reducing the minimum building setback. This is currently being reviewed under Site Plan Control…File A0372/25TEY · submitted Apr 23, 2025
- 3123 Church St · 240 m awayCommittee of Adjustment · Minor varianceTo construct a second storey addition above the existing dwelling.File A0386/17EYK · submitted Apr 26, 2017
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
05Quick answers about 154 King St
Is 154 King St in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 154 King St?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 154 King St?
Collection calendar Friday 2. Next garbage pickup: Nov 13, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location