159 Ridley Blvd
159 Ridley Blvd is in Bedford Park-Nortown. It's outside TRCA flood hazard areas and there is 1 planning application nearby (refused, now under appeal).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 1 planning application within 250 m: refused, now under appeal.
- Lead in tap-water samples is higher than average in postal area M5M.
03The building
0 building permits in the last 5 years. Together they added 1 new home. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 5 permits
- New Building · completed Oct 4, 2021
Proposal to demolish existing sfd and construct new two-storey detached dwelling. · 4 permits in this project (such as building, plumbing and heating) · Permit 19 243039 - Demolition · completed Feb 27, 2020
Proposal to demolish existing sfd and construct new two-storey detached dwelling. · Permit 19 243045
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5M, 15 of 422 home tap-water samples (3.6%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5M is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 39 samples here (9.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
1 active planning application within 250 m (about a 3-minute walk): refused, now under appeal. That's about typical for Toronto (the typical address has 1).
- 1157 Ridley Blvd · 15 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Apr 20, 2016. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
To construct a new two-storey dwelling with an integral garage. The existing dwelling would be demolished.File A0210/16NY · submitted Feb 26, 2016
No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: recycling and green bin. November 17: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 159 Ridley Blvd
Is 159 Ridley Blvd in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 159 Ridley Blvd?
There is 1 active planning application within 250 metres (refused, now under appeal). The closest is at 157 Ridley Blvd, 15 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 159 Ridley Blvd been renovated?
Yes. The City has 5 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 159 Ridley Blvd a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 159 Ridley Blvd?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 17, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location