16 Peach Tree Path
An address in Kingsview Village-The Westway, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (5)
- Porch · Revision Issued · Nov 27, 2015
Revision # 01 - New Railing system.Replace five (units 67, 69, 71, 73 & 75) concrete porch slab and stair for a common element condos (existing foundation and footing to remain). Previous permit… · Permit 15 128286 BLD - Porch · Inspection · Mar 26, 2015
Replace five (units 67, 69, 71, 73 & 75) concrete porch slab and stair for a common element condos (existing foundation and footing to remain). Previous permit related to #13-177965 BLD 00 SR. · Permit 15 128286 BLD - Porch · Cancelled · Sep 3, 2014
Replace five (units 45, 47, 55, 59, and 61) concrete porch slab and stair for a common element condos (existing foundation and footing to remain). Previous permit related to #13-177965 BLD 00 SR. · Permit 14 208857 BLD - Porch · Cancelled · Aug 19, 2013
Replace five (units 35, 37, 39, 41, 43)) concrete porch slab and stair for a common element condos (existing foundation and footing to remain). · Permit 13 177965 BLD - Porch · Cancelled · Aug 29, 2012
Replace six (units 25, 27, 29, 31, 33) concrete porche slab and stair for a common element condos (existing foundation and footing to remain). · Permit 12 215606 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 1 registered short-term rentals within 250 m.
04City services
05Quick answers about 16 Peach Tree Path
Is 16 Peach Tree Path in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 16 Peach Tree Path?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 16 Peach Tree Path?
Collection calendar Thursday 2. Next garbage pickup: Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location