168 Morrison Ave
168 Morrison Ave is in Corso Italia-Davenport. It's outside TRCA flood hazard areas and there are 2 planning applications nearby (one hearing on Dec 2, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 2 planning applications within 250 m: one hearing on Dec 2, one waiting for a hearing date.
- Lead in tap-water samples is higher than average in postal area M6E.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Other(SR) · completed Oct 26, 2017
Administrative folder for a party wall being constructed for a rear yard garage at 170 Morrison · Permit 08 189208
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6E, 15 of 434 home tap-water samples (3.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6E is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 47 samples here (11%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
2 active planning applications within 250 m (about a 3-minute walk): one hearing on Dec 2, one waiting for a hearing date. That's about typical for Toronto (the typical address has 1).
- 1188 Nairn Ave · 155 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Dec 2, 2026 at 9:30 a.m.. Neighbours can send comments or speak at the hearing.
To permit the reconstructed south exterior wall, rear second-storey addition, front porch with stairs, rear basement walkout, rear second-storey deck, and front and rear third-storey balconies, which were constructed beyond the limits of…File A0351/26TEY · submitted May 12, 2026 - 262 Teignmouth Ave · 225 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To permit the rear one-storey detached ancillary structure (deck an gazebo), which was constructed beyond the limits of the authorized building permit.File A0721/26TEY · submitted Sep 30, 2026
10 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 168 Morrison Ave
Is 168 Morrison Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 168 Morrison Ave?
There are 2 active planning applications within 250 metres (one hearing on Dec 2, one waiting for a hearing date). The closest is at 188 Nairn Ave, 155 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 168 Morrison Ave been renovated?
Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.
Is 168 Morrison Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 168 Morrison Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location