Skip to content
My Address in Toronto
Address report

169 Collier St

169 Collier St is in Rosedale-Moore Park, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (two approved, two under appeal, one refused).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • It is listed on the Heritage Register, which flags heritage value without full designation.
  • Outside TRCA flood hazard areas.
  • 5 planning applications within 250 m: two approved, two under appeal, one refused.
Building permits2in the last 5 years
Applications nearby5active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11recycling and green bin
Church StRosedale Valley RdPark RdYonge StAylmer AveBloor StMount Pleasant RdTed Rogers WayPine Hill RdCollier StAsquith AveReynolds StHuntley St12345Map data: City of Toronto (Toronto Centreline)Church StRosedale Valley RdPark RdBloor StRosedale RdCollier StAsquith Ave12345Map data: City of Toronto (Toronto Centreline)
The red dot is 169 Collier St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years2 permitsThis addressBuilding Permits · 2 on record

2 building permits in the last 5 years, for 1 project. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusListedThis addressHeritage Register

It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition.

Permit history: 1 project from 2 permits
  • Interior Alterations · completed Jun 23, 2025
    Proposal for wall removal · 2 permits in this project (such as building, plumbing and heating) · Permit 25 104308

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4W1.2% of tests above Ontario's limitYour area · M4WNon Regulated Lead Sample · 82 tests, Apr 27, 2014 to Mar 17, 2026

In postal area M4W, 1 of 82 home tap-water samples (1.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4W is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (6.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

5 active planning applications within 250 m (about a 3-minute walk): two approved, two under appeal, one refused. That's more than at most Toronto addresses (the typical address has 1).

  1. 1
    2 Elm Ave · 147 m away
    Condominium: a request to divide a building into condominium units

    It has been approved.

    Draft Plan of Condominium for 819 units.
    File 21 214202 STE 11 CD · submitted Sep 17, 2021 · City record
  2. 2
    50 Park Rd · 221 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…
    File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
  3. 3
    820 Church St · 223 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Sep 18, 2024.

    To alter the development standards for a 38-storey hotel building (as approved under Site Specific Zoning By-law 300-2023) by increasing the non-residential gross floor area, building height, and mechanical penthouse height. The new…
    File A0616/24TEY · submitted Jul 9, 2024
  4. 4
    235 Bloor St E · 240 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Nov 4, 2026.

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to…
    File A0664/26TEY · submitted Aug 31, 2026
  5. 5
    40 Park Rd · 243 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development…
    File 25 209063 STE 11 OZ · submitted Aug 12, 2025 · City record
Short-term rentals nearby2 registered homesWithin 250 mShort Term Rentals Registration

2 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 169 Collier St

Is 169 Collier St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 169 Collier St?

There are 5 active planning applications within 250 metres (two approved, two under appeal, one refused). The closest is at 2 Elm Ave, 147 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 169 Collier St been renovated?

Yes. The City has 2 building permits on record, 2 in the last 5 years. Source: Building Permits.

Is 169 Collier St a heritage property?

Yes. It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition. Source: Heritage Register.

When is garbage day at 169 Collier St?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

60-62 Asquith Avenue — Church Street Extension
1930 · 78 m away60-62 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 908
Church Street extension, wrecking on Asquith Avenue
1931 · 78 m awayChurch Street extension, wrecking on Asquith AvenueCity of Toronto Archives, Fonds 1266, Item 23219
68-70 Asquith Avenue — Church Street Extension
1930 · 78 m away68-70 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 910
64-66 Asquith Avenue — Church Street Extension
1930 · 78 m away64-66 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 907
52-54 Asquith Avenue — Church Street Extension
1930 · 78 m away52-54 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 912
Church Street extension, wrecking on Asquith Avenue
1931 · 78 m awayChurch Street extension, wrecking on Asquith AvenueCity of Toronto Archives, Fonds 1266, Item 23218
Church Street extension, from Asquith Avenue, looking south
1931 · 78 m awayChurch Street extension, from Asquith Avenue, looking southCity of Toronto Archives, Fonds 1266, Item 23220
56-58 Asquith Avenue — Church Street Extension
1930 · 78 m away56-58 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 905
81-83 Asquith Avenue — Church Street Extension
1930 · 78 m away81-83 Asquith Avenue — Church Street ExtensionCity of Toronto Archives, Fonds 200, Series 372, Subseries 3, Item 909

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

169 Collier St, Toronto M4W: permits, flood risk and what's planned nearby · My Address in Toronto