175 Clinton St
An address in Palmerston-Little Italy, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 2 Committee of Adjustment applications within 250 m.
01The building
Recent permits (6)
- Pool Fence Enclosure · Closed · Oct 7, 2019
Proposal to install a pool enclosure fence · Permit 19 205974 BLD - Garage · Closed · Oct 28, 2016
Proposal to demolish and reconstruct garage · Permit 16 240950 BLD - Multiple Projects · Inspection · May 25, 2015
Proposal to construct a 1-storey rear addition (26.3 m2) to 3 storey single family dwelling (APPROVED UNDER 13 142687BLD) , rear deck at 2nd floor and rear balcony from 3rd floor · Permit 14 255234 BLD - Building Permit Related(PS) · Inspection · May 8, 2013
Plumbing - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a basement walkout, reconstruct front porch and a new 3rd floor addition. See also 12… · Permit 13 142687 PLB - Multiple Projects · Inspection · May 8, 2013
Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a basement walkout, reconstruct front porch and a new 3rd floor addition. See also 12 258842 ZPR,… · Permit 13 142687 BLD - Building Permit Related(MS) · Inspection · May 8, 2013
HVAC - Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a basement walkout, reconstruct front porch and a new 3rd floor addition. See also 12… · Permit 13 142687 HVA
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 1519 Euclid Ave · 210 m · Committee of Adjustment · Minor variance · PostponedTo legalize and to maintain the rear ground floor deck with stairs that was constructed without an authorized building permit.File A0362/26TEY · submitted May 4, 2026
- 2541 Euclid Ave · 214 m · Committee of Adjustment · Minor variance · PostponedTo construct a new two-storey ancillary building (containing one laneway suite), abutting the laneway, in the rear yard of the existing two-and-one-half-storey detached dwelling. There will be two bicycle parking spaces in the rear yard,…File A0680/26TEY · submitted Sep 17, 2026
Development Applications; Committee of Adjustment Applications · 13 registered short-term rentals within 250 m.
04City services
05Quick answers about 175 Clinton St
Is 175 Clinton St in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 175 Clinton St?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 175 Clinton St?
Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives




Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location