18 Hazel Ave
18 Hazel Ave is in The Beaches. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (four waiting for a hearing date, one approved).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 5 planning applications within 250 m: four waiting for a hearing date, one approved.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 2 permits
- Addition(s) · completed Mar 6, 2024
Proposal to enclose back porch for existing sfd · Permit 21 172461 - Unknown · inspection · issued Oct 23, 1998
Build carport at rear. · Permit 98 023044
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4E, 9 of 488 home tap-water samples (1.8%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4E is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 22 samples here (4.5%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
5 active planning applications within 250 m (about a 3-minute walk): four waiting for a hearing date, one approved. That's more than at most Toronto addresses (the typical address has 1).
- 126 Hazel Ave · 34 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The Committee of Adjustment approved it on May 6, 2026.
To obtain consent to create a new easement/right-of-way.File B0020/26TEY · submitted Feb 19, 2026 - 22343 Queen St E · 115 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
File · submitted Feb 18, 2021 - 352 Balsam Ave · 146 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.File A0153/26TEY · submitted Feb 3, 2026 - 452 Balsam Ave · 146 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The hearing was postponed. A new date hasn't been published yet.
To obtain consent to sever the property into two residential lots.File B0023/26TEY · submitted Feb 3, 2026 - 552 Balsam Ave · 146 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.File A0154/26TEY · submitted Feb 3, 2026
12 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: recycling and green bin. November 17: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 18 Hazel Ave
Is 18 Hazel Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 18 Hazel Ave?
There are 5 active planning applications within 250 metres (four waiting for a hearing date, one approved). The closest is at 26 Hazel Ave, 34 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 18 Hazel Ave been renovated?
Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 18 Hazel Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 18 Hazel Ave?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 17, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives





Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location