18 Mapleview Ave
An address in Runnymede-Bloor West Village, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 3 Committee of Adjustment applications within 250 m.
01The building
Recent permits (5)
- Back Water Valve (Sewer only) · Closed · Mar 11, 2022
· Permit 22 121865 DRN - Building Permit Related(MS) · Closed · Feb 18, 2021
REVISION - as per the drawingsHVAC - Proposal for interior alterations (57.6m2) and new rear ground floor deck for existing single family dwelling. · Permit 20 209292 HVA - Building Permit Related(PS) · Inspection · Nov 17, 2020
Plumbing - Proposal for interior alterations (57.6m2) and new rear ground floor deck for existing single family dwelling. · Permit 20 209292 PLB - Building Permit Related(MS) · Closed · Nov 17, 2020
HVAC - Proposal for interior alterations (57.6m2) and new rear ground floor deck for existing single family dwelling. · Permit 20 209292 HVA - Multiple Projects · Closed · Nov 17, 2020
Proposal for interior alterations (57.6m2) and new rear ground floor deck for existing single family dwelling. · Permit 20 209292 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 1453 Durie St · 167 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo alter the existing two-storey detached dwelling by partially enclosing the existing front porch and constructing a partial front second-storey addition, a rear one-storey addition (mudroom), a rear two-storey addition, and a rear…File A0594/26TEY · submitted Aug 14, 2026
- 2542 Beresford Ave · 230 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo alter the existing two-storey detached dwelling by converting it into a three-storey semi-detached dwelling, constructing a partial third storey addition, and a rear two-storey addition with terrace above, a new front porch, a rear…File A0549/23TEY · submitted Jun 16, 2023
- 3542 Beresford Ave · 230 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo alter the existing two-storey detached dwelling by converting it into a three-storey semi-detached dwelling, constructing a partial third storey addition, a side (north) and rear two-storey addition with terrace above, a new front…File A0550/23TEY · submitted Jun 16, 2023
Development Applications; Committee of Adjustment Applications · 7 registered short-term rentals within 250 m.
04City services
05Quick answers about 18 Mapleview Ave
Is 18 Mapleview Ave in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 18 Mapleview Ave?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 18 Mapleview Ave?
Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives





Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location