Skip to content
My Address in Toronto
Address report

185 Cherry St

An address in South Riverdale, inside a TRCA flood or shoreline hazard area, with 1 active development application within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • Inside a TRCA flood or shoreline hazard area.
  • 1 active development application and 0 Committee of Adjustment applications within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications1active within 250 m
Flood hazardInsideTRCA mapping
Cherry StPolson St1Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years4 permitsThis addressBuilding Permits · 7 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (7)
  • Temporary Structures · Permit Issued · Aug 28, 2026
    Installation of temporary structures for a temporary one-day outdoor event, including a bandstand, viewing decks, and front-of-house platformSet up August 31 and Removal September 11 · Permit 26 226745 TPS
  • Certified Tents · Permit Issued · Aug 5, 2026
    Proposal for erecting one temporary tent (10x100¿ Frame tent (Cert#15 152028)) · Permit 26 211765 TPS
  • Other(TS) · Examiner's Notice Sent · Jul 31, 2026
    Proposed two temporary structures (stages) for Electric Island.Set up Aug. 6, 2026; tear down Aug. 10, 2026. · Permit 26 212100 TPS
  • Temporary Structures · Closed · Jun 26, 2026
    Installation of temporary structure for a one day even. Structures include bandstand, viewing decks and front-of-house platform. · Permit 26 188065 TPS
  • Temporary Structures · Closed · Jun 26, 2026
    Construct two temporary structures for Electric Island.Set up June 26, 2026; tear down June 29, 2026. · Permit 26 184755 TPS
  • Temporary Structures · Cancelled · Jun 19, 2026
    Installation of temporary structure for a one day even. Structures include bandstand, viewing decks and front-of-house platform. · Permit 26 187803 TPS
  • Certified Tents · Cancelled · Jun 12, 2026
    Proposal to Erect One (1) Temporary Tents: Tents: One (1) - 10x100¿ Frame tent (Cert#15 152028)Install: Wednesday June 24, 2026 .Dismantle: Monday June 29, 2026 · Permit 26 183308 TPS

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardInsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaInside — TRCA permit may be needed for workThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA62Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M5A4 of 104 above 0.01 ppmYour area · M5ANon Regulated Lead Sample · May 21, 2014 to Oct 15, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    80 Commissioners St · 239 m · Subdivision · Under Review
    Draft Plan of Subdivision to create fourteen (14) development blocks of varying sizes and configurations, and nine (9) additional blocks to facilitate new segments of the water's edge promenade and dockwall as well as a variety of…
    File 26 161475 STE 14 SB · submitted May 15, 2026 · City record

Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage daySee calendarThis addressCollection calendar No Collection
City councillorPaula FletcherWard 14councillor_fletcher@toronto.ca · 416-392-4060

05Quick answers about 185 Cherry St

Is 185 Cherry St in a flood plain?

Yes. It is inside a TRCA flood or shoreline hazard area. Source: TRCA Regulation mapping 2025.

What is being built near 185 Cherry St?

1 active development application within 250 metres, the closest at 80 Commissioners St (239 m). Source: Development Applications.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

185 Cherry St, Toronto — address report · My Address in Toronto