19 Bridgeview Rd
An address in Lambton Baby Point, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (6)
- Back Water Valve (Sewer only) · Inspection · Sep 4, 2018
Proposal to install back water valve. · Permit 18 219777 DRN - Building Permit Related(MS) · Revision Issued · Aug 9, 2007
HVAC - Addition of 2 storeys to rear of existing single family dwellingand interioro alteration to existing dwelling. Demolition of existing rear addition · Permit 07 113041 HVA - Addition(s) · Revision Issued · Jun 11, 2007
**REVISION: REMOVE A SECTION OF EXISTING FOUNDATION AND REPLACE WITH NEW**Addition of 2 storeys to rear of existing single family dwellingand interior alteration to existing dwelling. Demolition of… · Permit 07 113041 BLD - Addition(s) · Inspection · Apr 23, 2007
Addition of 2 storeys to rear of existing single family dwellingand interior alteration to existing dwelling. Demolition of existing rear addition · Permit 07 113041 BLD - Building Permit Related(MS) · Inspection · Apr 23, 2007
HVAC - Addition of 2 storeys to rear of existing single family dwellingand interioro alteration to existing dwelling. Demolition of existing rear addition · Permit 07 113041 HVA - Building Permit Related(PS) · Inspection · Apr 23, 2007
Plumbing - Addition of 2 storeys to rear of existing single family dwellingand interioro alteration to existing dwelling. Demolition of existing rear addition · Permit 07 113041 PLB
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.
04City services
05Quick answers about 19 Bridgeview Rd
Is 19 Bridgeview Rd in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 19 Bridgeview Rd?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 19 Bridgeview Rd?
Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location