19 Wallace Ave
19 Wallace Ave is in Junction-Wallace Emerson. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (two under review, one under appeal).
Data as of Nov 8, 2026 · Every item lists its source
- 3 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: two under review, one under appeal.
03The building
3 building permits in the last 5 years, for 1 project. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 3 permits
- Addition, deck or porch and more · completed Apr 8, 2024
To construct front two storey addition, interior alteration to existing dwelling, rear deck for two unit dwellings · 3 permits in this project (such as building, plumbing and heating) · Permit 21 192549
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6H, 13 of 538 home tap-water samples (2.4%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6H is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 25 samples here (4.6%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): two under review, one under appeal. That's about typical for Toronto (the typical address has 1).
- 11260 Dufferin St · 236 m awayPart Lot Control: a request to divide a block into separate lots, often for townhouses
City planners are reviewing it. Residents can comment before a decision is made.
Part Lot Control applicationFile 21 129062 STE 09 PL · submitted Mar 18, 2021 · City record - 21260 Dufferin St · 236 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Official Plan and Zoning By-law Amendment to increase the approved height and density onsite to accomodate additional purpose built and affordable rental dwelling units. On Block 3, Tower 3A increases by 13 storeys and Tower 3B increases…File 22 130626 STE 09 OZ · submitted Apr 5, 2022 · City record - 31260 Dufferin St · 236 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of Subdivision to support the implementation of the OPA/ZBA applications for the site:a total of ±2,846 residential units in a mix of housing forms including ±2685 residential units and 150 affordable rental units; ±27,503m2 of…File 18 214150 STE 18 SB · submitted Aug 23, 2018 · City record
12 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at 9 in 10 Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 19 Wallace Ave
Is 19 Wallace Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 19 Wallace Ave?
There are 3 active planning applications within 250 metres (two under review, one under appeal). The closest is at 1260 Dufferin St, 236 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 19 Wallace Ave been renovated?
Yes. The City has 3 building permits on record, 3 in the last 5 years. Source: Building Permits.
Is 19 Wallace Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 19 Wallace Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location