Skip to content
My Address in Toronto
Address report

191 Chaplin Cres

191 Chaplin Cres is in Yonge-Eglinton. It's outside TRCA flood hazard areas and there are 2 planning applications nearby (one approved, one under appeal after a refusal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 2 planning applications within 250 m: one approved, one under appeal after a refusal.
Building permits0in the last 5 years
Applications nearby2active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
Avenue RdOriole PkwyChaplin CresDuncannon DrTarlton RdCollege View AveDunvegan RdHillholm RdElmsthorpe AveBraemar AveLarratt StTranmer AveForest Hill Rd12Map data: City of Toronto (Toronto Centreline)Avenue RdChaplin CresDuncannon DrCollege View AveDunvegan RdElmsthorpe AveForest Hill RdLarratt StTranmer Ave12Map data: City of Toronto (Toronto Centreline)
The red dot is 191 Chaplin Cres. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 7 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 2 projects from 7 permits
  • Other(SR) · completed Oct 31, 2018
    Proposal for PV installation · Permit 18 119640
  • Addition and interior renovation · completed Oct 10, 2018
    REVISION 2 - to exterior wall assembly for SB12 complianceProposal for a second storey addition to existing 1 storey single family dwelling. Scope of work also includes interior alterations… · 6 permits in this project (such as building, plumbing and heating) · Permit 17 198424

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5P0.7% of tests above Ontario's limitYour area · M5PNon Regulated Lead Sample · 153 tests, Mar 18, 2014 to Aug 5, 2026

In postal area M5P, 1 of 153 home tap-water samples (0.7%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5P is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.3%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

2 active planning applications within 250 m (about a 3-minute walk): one approved, one under appeal after a refusal. That's about typical for Toronto (the typical address has 1).

  1. 1
    222 Chaplin Cres · 123 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Nov 4, 2026.

    To alter the existing one-storey detached by constructing a complete second storey addition, as well as front and side (east) ground floor additions (with basement additions below). A portion of the existing driveway at the southeast…
    File A0662/26TEY · submitted Sep 14, 2026
  2. 2
    192 Dunvegan Rd · 248 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Dec 8, 2021. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.

    To construct a new three-storey detached dwelling with front and rear first storey decks, and a rear second storey deck.
    File A1026/21TEY · submitted Aug 6, 2021
Short-term rentals nearby4 registered homesWithin 250 mShort Term Rentals Registration

4 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorJosh MatlowWard 12councillor_matlow@toronto.ca · 416-392-7906

05Quick answers about 191 Chaplin Cres

Is 191 Chaplin Cres in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 191 Chaplin Cres?

There are 2 active planning applications within 250 metres (one approved, one under appeal after a refusal). The closest is at 222 Chaplin Cres, 123 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 191 Chaplin Cres been renovated?

Yes. The City has 7 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 191 Chaplin Cres a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 191 Chaplin Cres?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

191 Chaplin Cres, Toronto M5P: permits, flood risk and what's planned nearby · My Address in Toronto