2 Eglinton Ave E is in North Toronto. It's outside TRCA flood hazard areas and there are 16 planning applications nearby (11 under review, four under appeal, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- 3 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
- 16 planning applications within 250 m: 11 under review, four under appeal, one waiting for a hearing date.
- Lead in tap-water samples is higher than average in postal area M4P.
03The building
3 building permits in the last 5 years, for 1 project. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 3 projects from 7 permits
- Interior Alterations · inspection · issued Apr 30, 2026
Proposed interior alterations for take-out eating establishment - new finishes, and equipment with applicable HVAC and plumbing. · 3 permits in this project (such as building, plumbing and heating) · Permit 26 127360 - Sign Building Permit Related · completed Sep 23, 2021
Propsal to erect and display one projecting sign and one wall sign both illuminated and displaying static copy. Erected on the first storey of the south elevation of the building. It is a part of… · Permit 19 215336 - Interior Alterations · completed Oct 13, 2021
Interior alterations - Unit 2 - Salus Fresh Food · 3 permits in this project (such as building, plumbing and heating) · Permit 19 177930
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4P, 6 of 114 home tap-water samples (5.3%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4P is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 14 samples here (12%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
16 active planning applications within 250 m (about a 3-minute walk): 11 under review, four under appeal, one waiting for a hearing date. That's more than at 9 in 10 Toronto addresses.
- 12345 Yonge St · 16 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Zoning By-law and Official Plan Amendment application to permit the redevelopment of the site with 54 and 56-storey towers, joined by a 10-storey residential podium with ground floor retail. The proposed buildings will include…File 21 220609 STE 12 OZ · submitted Oct 1, 2021 · City record - 22345 Yonge St · 16 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of Subdivision to create 3 development blocks.File 21 220607 STE 12 SB · submitted Oct 1, 2021 · City record - 32329 Yonge St · 70 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 34 storey mixed-use buildingFile 21 219447 STE 12 SA · submitted Sep 29, 2021 · City record - 42329 Yonge St · 70 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft plan of subdivision for 3 development blocks.File 21 219445 STE 12 SB · submitted Sep 29, 2021 · City record - 52323 Yonge St · 90 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 34 storey mixed-use buildingFile 21 219447 STE 12 SA · submitted Sep 29, 2021 · City record - 62323 Yonge St · 90 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft plan of subdivision for 3 development blocks.File 21 219445 STE 12 SB · submitted Sep 29, 2021 · City record - 750 Eglinton Ave E · 106 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The hearing was postponed. A new date hasn't been published yet.
File B0068/26TEY · submitted Sep 30, 2026 - 82350 Yonge St · 117 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential…File 22 176294 NNY 08 OZ · submitted Jul 13, 2022 · City record - 92350 Yonge St · 117 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential…File 22 176293 NNY 08 SA · submitted Jul 13, 2022 · City record - 102352 Yonge St · 120 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential…File 22 176294 NNY 08 OZ · submitted Jul 13, 2022 · City record - 112346 Yonge St · 131 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Application for a 56-storey mixed-use building containing 407 residential units and 272.2 square-meters of commercial space at-grade. The building will feature a 3-storey podium with outdoor amenity space above, and a 53-storey tower. It…File 24 146664 NNY 08 OZ · submitted May 10, 2024 · City record - 122346 Yonge St · 131 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Control Application proposing a 56-storey mixed-use building containing 407 residential units, with a combined Gross Floor Area of 36,656 square-meters including 272 square-meters of commercial space at-grade.File 24 245867 NNY 08 SA · submitted Dec 2, 2024 · City record
24 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 2 Eglinton Ave E
Is 2 Eglinton Ave E in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 2 Eglinton Ave E?
There are 16 active planning applications within 250 metres (11 under review, four under appeal, one waiting for a hearing date). The closest is at 2345 Yonge St, 16 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 2 Eglinton Ave E been renovated?
Yes. The City has 7 building permits on record, 3 in the last 5 years. Source: Building Permits.
Is 2 Eglinton Ave E a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 2 Eglinton Ave E?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.