Skip to content
My Address in Toronto
Address report

2 Fairmount Cres

An address in Woodbine Corridor, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 0 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications1active within 250 m
Flood hazardOutsideTRCA mapping
Eastwood RdDuvernet AveBellhaven RdBowmore RdWembley DrHollywood CresGainsborough RdGlenmore RdBeaton AveNormandy BlvdFairmount CresWildwood CresKingsmount Park RdWrenson RdWoodbine AveGerrard St E1Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years4 permitsThis addressBuilding Permits · 4 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (4)
  • Addition(s) · Closed · Feb 28, 2023
    REVISION TO PERMIT# 22 210324, BY ALTERING BASEMENT PLAN.Proposal is to reconstruct one storey rear addition and construct 2nd storey above it (2 storey rear addition) · Permit 22 210324 BLD
  • Building Permit Related(MS) · Closed · Feb 13, 2023
    HVAC - Proposal is to reconstruct one storey rear addition and construct 2nd storey above it (2 storey rear addition) · Permit 22 210324 HVA
  • Building Permit Related(PS) · Closed · Oct 6, 2022
    Plumbing - Proposal is to reconstruct one storey rear addition and construct 2nd storey above it (2 storey rear addition) · Permit 22 210324 PLB
  • Addition(s) · Closed · Oct 6, 2022
    Proposal is to reconstruct one storey rear addition and construct 2nd storey above it (2 storey rear addition) · Permit 22 210324 BLD

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA32Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M4L10 of 592 above 0.01 ppmYour area · M4LNon Regulated Lead Sample · Jan 15, 2014 to Sep 18, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    1820 Gerrard St E · 151 m · Committee of Adjustment · Minor variance · Closed
    To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear addition and a rear first storey deck.
    File A0198/21TEY · submitted Feb 19, 2021

Development Applications; Committee of Adjustment Applications · 7 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 17, 2026This addressCollection calendar Tuesday 1
Next recyclingNovember 10, 2026This addressSolid Waste Collection Schedule
City councillorBrad BradfordWard 19councillor_bradford@toronto.ca · 416-338-2755

05Quick answers about 2 Fairmount Cres

Is 2 Fairmount Cres in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 2 Fairmount Cres?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 2 Fairmount Cres?

Collection calendar Tuesday 1. Next garbage pickup: Nov 17, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

View of Gerrard Street East, looking east across Hollywood Crescent
View of Gerrard Street East, looking east across Hollywood Crescent, 1984. City of Toronto Archives, Fonds 1526, File 71, Item 172. 105 m away.
View of Gerrard Street East, looking east across Hollywood Crescent
View of Gerrard Street East, looking east across Hollywood Crescent, 1984. City of Toronto Archives, Fonds 1526, File 71, Item 173. 105 m away.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

2 Fairmount Cres, Toronto — address report · My Address in Toronto