2 Kingston Rd
2 Kingston Rd is in Woodbine Corridor, in a registered apartment building built in 1970 with 16 units. It's outside TRCA flood hazard areas and there are no active planning applications nearby.
Data as of Nov 8, 2026 · Every item lists its source
- This building scored 95 out of 100 when last evaluated (Jul 21, 2025). That's higher than 67% of evaluated buildings in Toronto.
- No fire code violations in open inspections.
- 6 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
01The building
RentSafe is the City's inspection program for apartment buildings with 3+ storeys and 10+ units. This building scored 95 out of 100 when last evaluated (Jul 21, 2025). That's higher than 67% of evaluated buildings in Toronto.
6 building permits in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 7 projects from 7 permits
- Backflow Prevention Devices (Water only) · inspection · issued Feb 25, 2026
Install domestic premise backflows on site · Permit 26 116338 - Backflow Prevention Devices (Water only) · completed Mar 30, 2026
Install domestic premise backflows on site · Permit 26 116545 - Backflow Prevention Devices (Water only) · completed Mar 30, 2026
Proposal to install a backflow prevention device. · Permit 26 116248 - Backflow Prevention Devices (Water only) · completed Mar 30, 2026
Proposal to install a backflow prevention device. · Permit 26 116251 - Backflow Prevention Devices (Water only) · completed Mar 30, 2026
Install domestic premise backflows on site · Permit 26 115913 - Backflow Prevention Devices (Water only) · completed Mar 30, 2026
Install domestic premise backflows on site · Permit 26 115927 - Building work · permit issued · issued Aug 19, 2013
Proposal to install telecommunication antennas on the roof along with a Bell prefabricated equipment shelter on the north side of the property. · Permit 13 206645
02Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4L, 10 of 667 home tap-water samples (1.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4L is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 40 samples here (6.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. Buildings with more than six units don't have lead service pipes.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active planning applications within 250 m (about a 3-minute walk). Most Toronto addresses (64%) have at least one application nearby.
10 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
04City services
Next: November 10: recycling and green bin. November 17: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 2 Kingston Rd
Is 2 Kingston Rd in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
Does 2 Kingston Rd have open fire code violations?
No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.
What is being built near 2 Kingston Rd?
There are no active development or Committee of Adjustment applications within 250 metres. Source: Development Applications; Committee of Adjustment Applications.
Has 2 Kingston Rd been renovated?
Yes. The City has 7 building permits on record, 6 in the last 5 years. Source: Building Permits.
Is 2 Kingston Rd a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 2 Kingston Rd?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 17, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location