Skip to content
My Address in Toronto
Address report

2 Waterloo Ter

A property on the Heritage Register (Part V), outside TRCA flood and shoreline hazard areas, with 15 active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • On the Heritage Register (Part V).
  • Outside TRCA flood and shoreline hazard areas.
  • 15 active development applications and 2 Committee of Adjustment applications within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications17active within 250 m
Flood hazardOutsideTRCA mapping
Morrison StDraper StWellington St WPortland StStewart StMaud StBrant StTecumseth StMichener CrtRichmond St WAdelaide St WWhitaker AvePortugal SqMitchell AveKing St WBathurst St123456789101112Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 0 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusPart V · King-Spadina HCD HCDThis addressHeritage Register

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA62Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M5V3 of 25 above 0.01 ppmYour area · M5VNon Regulated Lead Sample · May 22, 2014 to Aug 26, 2025

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    143 Portland St · 53 m · Condominium · Under Review
    *** Draft Plan of Condominium for 129 units in a 16-storey building.
    File 21 234402 STE 10 CD · submitted Nov 4, 2021 · City record
  2. 2
    141 Portland St · 55 m · Condominium · Under Review
    *** Draft Plan of Condominium for 129 units in a 16-storey building.
    File 21 234402 STE 10 CD · submitted Nov 4, 2021 · City record
  3. 3
    139 Portland St · 58 m · Condominium · Under Review
    *** Draft Plan of Condominium for 129 units in a 16-storey building.
    File 21 234402 STE 10 CD · submitted Nov 4, 2021 · City record
  4. 4
    137 Portland St · 60 m · Condominium · Under Review
    *** Draft Plan of Condominium for 129 units in a 16-storey building.
    File 21 234402 STE 10 CD · submitted Nov 4, 2021 · City record
  5. 5
    135 Portland St · 63 m · Condominium · Under Review
    *** Draft Plan of Condominium for 129 units in a 16-storey building.
    File 21 234402 STE 10 CD · submitted Nov 4, 2021 · City record
  6. 6
    555 Richmond St W · 94 m · Site Plan · Under Review
    Application for Site Plan approval for a new building at 555 Richmond Street West. The existing 12-storey office building fronting Richmond Street will be retained and a new 16-storey mixed-use building with commercial uses on the ground…
    File 22 138136 STE 10 SA · submitted Apr 25, 2022 · City record
  7. 7
    555 Richmond St W · 94 m · Subdivision · Under Review
    Draft Plan of Subdivision for 1 block.
    File 21 234930 STE 10 SB · submitted Nov 5, 2021 · City record
  8. 8
    555 Richmond St W · 94 m · Official Plan / Rezoning · Under Review
    Application to Amend the Zoning By-law to permit the redevelopment of the site at 555 Richmond Street West. The existing 12-storey office building fronting Richmond Street will be retained and a new 16-storey residential rental building…
    File 21 172691 STE 10 OZ · submitted Jun 18, 2021 · City record
  9. 9
    579 Richmond St W · 127 m · Official Plan / Rezoning · Under Review
    Application to Amend the Zoning By-law to permit the redevelopment of the site at 141, 149 - 161 Bathurst Street and 579, 589-591 Richmond Street West with a 12-storey non-residential building containing retail uses at the ground level…
    File 21 172654 STE 10 OZ · submitted Jun 18, 2021 · City record
  10. 10
    579 Richmond St W · 127 m · Site Plan · Under Review
    Site Plan Approval for the properties at 141, 149-161 Bathurst Street, 579, 589 and 591 Richmond Street West to facilitate the development of a 12-storey office building with ground related retail. This application is being reviewing in…
    File 21 250827 STE 10 SA · submitted Dec 22, 2021 · City record
  11. 11
    589 Richmond St W · 140 m · Site Plan · Under Review
    Site Plan Approval for the properties at 141, 149-161 Bathurst Street, 579, 589 and 591 Richmond Street West to facilitate the development of a 12-storey office building with ground related retail. This application is being reviewing in…
    File 21 250827 STE 10 SA · submitted Dec 22, 2021 · City record
  12. 12
    589 Richmond St W · 140 m · Official Plan / Rezoning · Under Review
    Application to Amend the Zoning By-law to permit the redevelopment of the site at 141, 149 - 161 Bathurst Street and 579, 589-591 Richmond Street West with a 12-storey non-residential building containing retail uses at the ground level…
    File 21 172654 STE 10 OZ · submitted Jun 18, 2021 · City record

Development Applications; Committee of Adjustment Applications · 15 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 10, 2026This addressCollection calendar Tuesday 2
Next recyclingNovember 17, 2026This addressSolid Waste Collection Schedule
City councillorAusma MalikWard 10Councillor_Malik@toronto.ca · 416-392-4044

05Quick answers about 2 Waterloo Ter

Is 2 Waterloo Ter in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 2 Waterloo Ter?

15 active development applications within 250 metres, the closest at 143 Portland St (53 m). Source: Development Applications.

When is garbage day at 2 Waterloo Ter?

Collection calendar Tuesday 2. Next garbage pickup: Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

King St W., north side, east of Portland
King St W., north side, east of Portland, 1981. City of Toronto Archives, Fonds 1526, File 67, Item 73. 118 m away.
King St W., north side, east of Portland
King St W., north side, east of Portland, 1981. City of Toronto Archives, Fonds 1526, File 67, Item 74. 118 m away.
Parisian Laundry Building, 602 King Street West at Portland Street
Parisian Laundry Building, 602 King Street West at Portland Street, 1980. City of Toronto Archives, Fonds 200, Series 1465, File 52, Item 30. 118 m away.
Close view of Otto Higel building at King and Bathurst Street
Close view of Otto Higel building at King and Bathurst Street, 1981. City of Toronto Archives, Fonds 1526, File 7, Item 19. 130 m away.
View of Bathurst Street from north at King Street West
View of Bathurst Street from north at King Street West, 1981. City of Toronto Archives, Fonds 1526, File 71, Item 11. 130 m away.
View of King Street West, looking east from Bathurst Street
View of King Street West, looking east from Bathurst Street, 1981. City of Toronto Archives, Fonds 1526, File 74, Item 31. 130 m away.
View of the Otto Higel building at King and Bathurst Street
View of the Otto Higel building at King and Bathurst Street, 1981. City of Toronto Archives, Fonds 1526, File 7, Item 13. 130 m away.
View of the Furniture Factory at Bathurst and King Street
View of the Furniture Factory at Bathurst and King Street, 1977. City of Toronto Archives, Fonds 1526, File 7, Item 3. 130 m away.
King St, east, from Bathurst, to Spadina, (Way Department)
King St, east, from Bathurst, to Spadina, (Way Department), 1927. City of Toronto Archives, Fonds 16, Series 71, Item 4855. 130 m away.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

2 Waterloo Ter, Toronto — address report · My Address in Toronto