200 Bloor St E
200 Bloor St E is in Rosedale-Moore Park, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 2 planning applications nearby (one approved, one refused).
Data as of Nov 8, 2026 · Every item lists its source
- 24 building permits in the last 5 years.
- It is listed on the Heritage Register, which flags heritage value without full designation.
- Outside TRCA flood hazard areas.
- 2 planning applications within 250 m: one approved, one refused.
03The building
24 building permits in the last 5 years, for 10 projects. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition.
Permit history: 10 projects from 25 permits (most recent 25 of 157)
- Interior Alterations · permit issued · issued Jun 4, 2025
Proposal for interior alterations to existing office space - South Tower 6th Floor · 2 permits in this project (such as building, plumbing and heating) · Permit 25 139101 - Interior Alterations · permit issued · issued May 5, 2025
Proposal for interior alterations to existing office space - North Tower 4th Floor · 2 permits in this project (such as building, plumbing and heating) · Permit 25 139083 - Interior Alterations · permit issued · issued Apr 23, 2025
Proposal for interior alterations to existing office space - UNIT 200 · 2 permits in this project (such as building, plumbing and heating) · Permit 25 138879 - Interior Alterations · completed Feb 10, 2026
Proposal for interior alterations to existing office space on the ground loor to convert into a modern autonomous store. Convenience address is 220 Bloor St E. · 2 permits in this project (such as building, plumbing and heating) · Permit 24 197854 - Interior Alterations · completed Jul 19, 2024
Proposal for interior alterations to the existing 11th floor office level for new office tenant - 'Manulife'. [North Tower] · 3 permits in this project (such as building, plumbing and heating) · Permit 23 228610 - Alternative Solution · completed Mar 31, 2022
Fire proofing existing floor structure · Permit 22 115243 - Interior Alterations · completed Jun 24, 2022
Proposal for Interior demolition to 11th Floor. · 3 permits in this project (such as building, plumbing and heating) · Permit 21 248395 - Interior Alterations · permit issued · issued Nov 23, 2021
Proposal for interior alterations to return a portion of the 2nd floor level to base building condition. (Redevelopment Phase 3) · 2 permits in this project (such as building, plumbing and heating) · Permit 21 230435 - Interior Alterations · completed Oct 5, 2022
Proposed interior alterations of ground floor level for new meeting rooms and lounge area and installation of new HVAC equipment at basement and second floor levels in existing office building. · 3 permits in this project (such as building, plumbing and heating) · Permit 21 185206 - Interior Alterations · completed Aug 17, 2022
Revision 01. Addition of a food kiosk in the existing space including 2 additional plumbing fixtures.Proposal for interior alterations to 2nd floor employee lounge "Manulife" · 5 permits in this project (such as building, plumbing and heating) · Permit 21 231891
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4W, 1 of 82 home tap-water samples (1.2%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4W is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (6.1%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
2 active planning applications within 250 m (about a 3-minute walk): one approved, one refused. That's about typical for Toronto (the typical address has 1).
- 12 Elm Ave · 79 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Condominium for 819 units.File 21 214202 STE 11 CD · submitted Sep 17, 2021 · City record - 2235 Bloor St E · 174 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Nov 4, 2026.
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to…File A0664/26TEY · submitted Aug 31, 2026
2 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 200 Bloor St E
Is 200 Bloor St E in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 200 Bloor St E?
There are 2 active planning applications within 250 metres (one approved, one refused). The closest is at 2 Elm Ave, 79 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 200 Bloor St E been renovated?
Yes. The City has 157 building permits on record, 24 in the last 5 years. Source: Building Permits.
Is 200 Bloor St E a heritage property?
Yes. It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition. Source: Heritage Register.
When is garbage day at 200 Bloor St E?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location