Skip to content
My Address in Toronto
Address report

2013 Yonge St

2013 Yonge St is in South Eglinton-Davisville, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 16 planning applications nearby (12 under review, two under appeal, one approved, one other).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • It is listed on the Heritage Register, which flags heritage value without full designation.
  • Outside TRCA flood hazard areas.
  • 16 planning applications within 250 m: 12 under review, two under appeal, one approved, one other.
Building permits1in the last 5 years
Applications nearby16active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11garbage, green bin and yard waste
Yonge StTranmer AveColin AveGlebe RdLola RdDuplex AveOswald CresTullis DrManor RdBelsize DrCuthbert CresHillsdale AveWilfrid AveServington CresCarey RdImperial St123456789101112Map data: City of Toronto (Toronto Centreline)Yonge StGlebe RdLola RdDuplex AveManor LaneTullis DrManor RdCuthbert CresCarey RdImperial St123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 2013 Yonge St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 4 on record

1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusListedThis addressHeritage Register

It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition.

Permit history: 4 projects from 4 permits
  • Sign Building Permit Related · work not started · issued Jul 30, 2025
    1 wall sign**amico pizza** · Permit 25 189525
  • Sign Building Permit Related · completed Oct 7, 2021
    To erect and display one illuminated projecting sign.****MY ROTI PLACE**** · Permit 18 265582
  • Sign Building Permit Related · completed Mar 2, 2020
    To erect and display one non illuminated wall sign******JUMPING BRANDING***** · Permit 18 119582
  • Sign Building Permit Related · completed Mar 2, 2020
    To erect and display three illuminated wall signs.**THAI CUISINE** · Permit 18 117572

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M4S2.3% of tests above Ontario's limitYour area · M4SNon Regulated Lead Sample · 220 tests, Feb 20, 2014 to Oct 16, 2026

In postal area M4S, 5 of 220 home tap-water samples (2.3%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4S is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 17 samples here (7.7%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

16 active planning applications within 250 m (about a 3-minute walk): 12 under review, two under appeal, one approved, one other. That's more than at 9 in 10 Toronto addresses.

  1. 1
    50 Tullis Dr · 99 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  2. 2
    46 Tullis Dr · 108 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  3. 3
    44 Tullis Dr · 113 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  4. 4
    2049 Yonge St · 121 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  5. 5
    42 Tullis Dr · 122 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  6. 6
    2128 Yonge St · 125 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 80 units.
    File 21 231736 STE 12 CD · submitted Oct 28, 2021 · City record
  7. 7
    2128 Yonge St · 125 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City Council approved it.

    Proposed 12-storey (45.1 metres including the mechanical penthouse) mixed-use building containing 80 dwelling units and 221 square metres of retail. The total gross floor area is 5,648 square metres and the site density is 7.3 times the…
    File 17 274171 STE 22 OZ · submitted Dec 11, 2017 · City record
  8. 8
    40 Tullis Dr · 127 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  9. 9
    2045 Yonge St · 134 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  10. 10
    2039 Yonge St · 147 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed redevelopment of the site for an 11-storey mixed-use building fronting onto Yonge Street, and connected to seven 3-storey townhouse units fronting onto Tullis Drive.
    File 22 193935 STE 12 SA · submitted Aug 22, 2022 · City record
  11. 11
    29 Berwick Ave · 180 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 162.15 m + 8.0 m MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,588.9 sq. m., which…
    File 25 191657 STE 12 OZ · submitted Jul 10, 2025 · City record
  12. 12
    29 Berwick Ave · 180 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    The application proposes to redevelop the subject site by constructing a 49-storey residential building with a height of 158.2 m + MPH. The proposed redevelopment consists of a total gross floor area (GFA) of 34,641.7 sq. m., which…
    File 25 191649 STE 12 SA · submitted Jul 10, 2025 · City record
Short-term rentals nearby5 registered homesWithin 250 mShort Term Rentals Registration

5 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorJosh MatlowWard 12councillor_matlow@toronto.ca · 416-392-7906

05Quick answers about 2013 Yonge St

Is 2013 Yonge St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 2013 Yonge St?

There are 16 active planning applications within 250 metres (12 under review, two under appeal, one approved, one other). The closest is at 50 Tullis Dr, 99 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 2013 Yonge St been renovated?

Yes. The City has 4 building permits on record, 1 in the last 5 years. Source: Building Permits.

Is 2013 Yonge St a heritage property?

Yes. It is listed on the Heritage Register, which flags heritage value without full designation. Owners must give the City 60 days' notice before demolition. Source: Heritage Register.

When is garbage day at 2013 Yonge St?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Construction of Glebe Road, looking  west towards Yonge Street
1911 · 25 m awayConstruction of Glebe Road, looking west towards Yonge StreetCity of Toronto Archives, Fonds 1244, Item 505
Limelight Theatre - Yonge St. nw corner of Glebe Rd. & Yonge St.
1981 · 25 m awayLimelight Theatre - Yonge St. nw corner of Glebe Rd. & Yonge St. Courtesy of Toronto Public Library
No. 2042-2052 Yonge Street, corner of Lola Road
1921 · 88 m awayNo. 2042-2052 Yonge Street, corner of Lola RoadCity of Toronto Archives, Fonds 1231, Item 854
No. 2084-2090 Yonge Street between Manor and Lola roads
1921 · 88 m awayNo. 2084-2090 Yonge Street between Manor and Lola roadsCity of Toronto Archives, Fonds 1231, Item 857
Yonge Street north from Belsize Drive
1917 · 89 m awayYonge Street north from Belsize DriveCity of Toronto Archives, Fonds 1231, Item 1711
1974-76 Yonge St., nw corner of Imperial St. & Yonge - Host Rent A Car
1981 · 144 m away1974-76 Yonge St., nw corner of Imperial St. & Yonge - Host Rent A Car Courtesy of Toronto Public Library
No. 1974-1982 Yonge Street corner of Imperial Street
1921 · 144 m awayNo. 1974-1982 Yonge Street corner of Imperial StreetCity of Toronto Archives, Fonds 1231, Item 711
No. 1966 Yonge Street at Imperial Street
1921 · 144 m awayNo. 1966 Yonge Street at Imperial StreetCity of Toronto Archives, Fonds 1231, Item 852
View of the rear of Yonge Street during demolition, top of Imperial Six in background
1973 · 144 m awayView of the rear of Yonge Street during demolition, top of Imperial Six in backgroundCity of Toronto Archives, Fonds 1526, File 83, Item 49

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

2013 Yonge St, Toronto M4S: permits, flood risk and what's planned nearby · My Address in Toronto