Skip to content
My Address in Toronto
Address report

22 Bradham Path

An address in New Toronto, outside TRCA flood and shoreline hazard areas, with 3 active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • No fire code violations in open inspections.
  • Outside TRCA flood and shoreline hazard areas.
  • 3 active development applications and 0 Committee of Adjustment applications within 250 m.
RentSafe score—not a registered apartment building
Fire code violations0in open inspections
Applications3active within 250 m
Flood hazardOutsideTRCA mapping
Eighth StSeventh StNinth StThirteenth StTwelfth StFourteenth StBirmingham StSixth StGarnett Janes RdTenth StCoin StEtta Wylie RdIslington AveLake Shore Blvd W123Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo violations in open inspectionsThis addressResidential Fire Inspection Results · last opened May 21, 2025
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 0 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA53Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M8V1 of 116 above 0.01 ppmYour area · M8VNon Regulated Lead Sample · Apr 3, 2014 to Sep 7, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    260 Eighth St · 109 m · Site Plan · Under Review
    The project proposal seeks to construct 2 one-storey industrial warehouse and distribution buildings with accessory office. The existing unoccupied three-storey building (Heritage) is proposed to remain and be incorporated into the…
    File 24 173799 WET 03 SA · submitted Jul 3, 2024 · City record
  2. 2
    124 Birmingham St · 110 m · Site Plan · Under Review
    The project proposal seeks to construct 2 one-storey industrial warehouse and distribution buildings with accessory office. The existing unoccupied three-storey building (Heritage) is proposed to remain and be incorporated into the…
    File 24 173799 WET 03 SA · submitted Jul 3, 2024 · City record
  3. 3
    99 Birmingham St · 219 m · Official Plan / Rezoning · OMB Appeal
    The proposed development consists of a 26-storey mixed use building, containing 352 dwelling units with retail uses at-grade. The proposed net density is 8.83 times the area of the lot. The total building height is 80.47 metres, exclusive…
    File 23 228917 WET 03 OZ · submitted Nov 23, 2023 · City record

Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 11, 2026This addressCollection calendar Wednesday 2
Next recyclingNovember 18, 2026This addressSolid Waste Collection Schedule
City councillorAmber MorleyWard 3Councillor_Morley@toronto.ca · 416-397-9273

05Quick answers about 22 Bradham Path

Is 22 Bradham Path in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

Does 22 Bradham Path have open fire code violations?

No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.

What is being built near 22 Bradham Path?

3 active development applications within 250 metres, the closest at 260 Eighth St (109 m). Source: Development Applications.

When is garbage day at 22 Bradham Path?

Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

22 Bradham Path, Toronto — address report · My Address in Toronto