Skip to content
My Address in Toronto
Address report

234 Bathurst St

234 Bathurst St is in Trinity-Bellwoods. It's outside TRCA flood hazard areas and there are 2 planning applications nearby (one under appeal after a refusal, one approved).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 2 planning applications within 250 m: one under appeal after a refusal, one approved.
Building permits0in the last 5 years
Applications nearby2active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
Bathurst StQueen StRichmond StRyerson AveAugusta AveRobinson StManning AvePalmerston AveCarr StWolseley StEuclid AveMarkham StDenison AvePortland StEden Pl12Map data: City of Toronto (Toronto Centreline)Bathurst StQueen StRyerson AveAndrews AvePalmerston AveCarr StWolseley StMarkham StRobinson StEden Pl12Map data: City of Toronto (Toronto Centreline)
The red dot is 234 Bathurst St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalRegistered (1 unit)This addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 1 permit
  • Interior Alterations · completed Nov 10, 2025
    Proposal for interior alterations and convert to 2 units. · Permit 17 176651

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5T0% of tests above Ontario's limitYour area · M5TNon Regulated Lead Sample · 85 tests, Feb 20, 2014 to Sep 11, 2026

In postal area M5T, 0 of 85 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5T is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (1.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

2 active planning applications within 250 m (about a 3-minute walk): one under appeal after a refusal, one approved. That's about typical for Toronto (the typical address has 1).

  1. 1
    74 Markham St · 131 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Oct 14, 2026. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.

    To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south)…
    File A0603/26TEY · submitted Aug 17, 2026
  2. 2
    42 Carr St · 200 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Nov 4, 2026.

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered…
    File A0667/26TEY · submitted Sep 8, 2026
Short-term rentals nearby48 registered homesWithin 250 mShort Term Rentals Registration

48 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorAusma MalikWard 10Councillor_Malik@toronto.ca · 416-392-4044

05Quick answers about 234 Bathurst St

Is 234 Bathurst St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 234 Bathurst St?

There are 2 active planning applications within 250 metres (one under appeal after a refusal, one approved). The closest is at 74 Markham St, 131 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 234 Bathurst St been renovated?

Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.

Is 234 Bathurst St a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 234 Bathurst St?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

61 Markham St.
1939 · 91 m away61 Markham St.City of Toronto Archives, Fonds 200, Series 372, Subseries 33, Item 640
61 Markham Street
1939 · 91 m away61 Markham StreetCity of Toronto Archives, Fonds 200, Series 372, Subseries 33, Item 614
Bathurst St, north, from Wolseley Loop, (Way Department)
1935 · 118 m awayBathurst St, north, from Wolseley Loop, (Way Department)City of Toronto Archives, Fonds 16, Series 71, Item 10873
Bathurst St., n.e. corner Wolseley St?
1927 · 118 m awayBathurst St., n.e. corner Wolseley St? Courtesy of Toronto Public Library
57 Ryerson Avenue
1939 · 207 m away57 Ryerson AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 33, Item 648
57 Ryerson Avenue
1939 · 207 m away57 Ryerson AvenueCity of Toronto Archives, Fonds 200, Series 372, Subseries 33, Item 647
Queen St W., north side, west of Bathurst, building detail
1984 · 213 m awayQueen St W., north side, west of Bathurst, building detailCity of Toronto Archives, Fonds 1526, File 70, Item 85
Street photography: Queen Street West, Bathurst Street
213 m awayStreet photography: Queen Street West, Bathurst StreetCity of Toronto Archives, Fonds 427, Series 1907, File 72, Item 26
Toronto Harbour 1847, looking east from Queen's Wharf, foot of Bathurst St., Toronto, Ont.
1889 · 213 m awayToronto Harbour 1847, looking east from Queen's Wharf, foot of Bathurst St., Toronto, Ont. Courtesy of Toronto Public Library

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

234 Bathurst St, Toronto M5T: permits, flood risk and what's planned nearby · My Address in Toronto