240 First Ave
A property on the Heritage Register (Part V), outside TRCA flood and shoreline hazard areas, with 2 active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- On the Heritage Register (Part V).
- Outside TRCA flood and shoreline hazard areas.
- 2 active development applications and 2 Committee of Adjustment applications within 250 m.
01The building
Recent permits (2)
- Demolition · Cancelled · May 3, 2023
To demolish existing auto body service garage and a wooden shed · Permit 23 140968 DEM - Backflow Prevention Devices (Water only) · Permit Issued · Nov 23, 2011
permit to install backflow on ground floor of existing autobody repair garage · Permit 11 299542 PSA
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 1425 Carlaw Ave · 115 m · Site Plan · Under ReviewSite Plan Control Placeholder for Gerrard Station, one of the stations included in the Ontario Line Elevated Guideway and Stations contract.File 24 252705 STE 14 SA · submitted Dec 20, 2024 · City record
- 2354-358 Pape Ave · 206 m · Site Plan · Under ReviewCombine application for rezoning and site plan approval to permit a proposed mixed use development. The proposed building will be 8 storeys (24.6 metres in height) and comprised of 30 residential units and non residential uses on the…File 14 147899 STE 30 SA · submitted Apr 28, 2014
- 322 Badgerow Ave · 207 m · Committee of Adjustment · Minor variance · ApprovedTo permit and maintain the existing front porch enclosure of the three-storey semi-detached dwelling, which was constructed beyond the limits of the approved building permit (24 150571 BLD 03 SR). There is a total of two residential…File A0636/26TEY · submitted Aug 28, 2026
- 421 Badgerow Ave · 226 m · Committee of Adjustment · Minor variance · OMB AppealTo alter the existing 2 ½-storey semi-detached dwelling constructing: a rear second and third floor addition with a rear third floor balcony, a front one-storey addition and to convert the dwelling into two residential units.File A0366/16TEY · submitted Mar 30, 2016
Development Applications; Committee of Adjustment Applications · 1 registered short-term rentals within 250 m.
04City services
05Quick answers about 240 First Ave
Is 240 First Ave in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 240 First Ave?
2 active development applications within 250 metres, the closest at 425 Carlaw Ave (115 m). Source: Development Applications.
When is garbage day at 240 First Ave?
Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.