Skip to content
My Address in Toronto
Address report

25 Allingham Gdns

An address in Clanton Park, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 0 active development applications and 4 Committee of Adjustment applications within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications4active within 250 m
Flood hazardOutsideTRCA mapping
Graymar AveDe Quincy BlvdAlmont RdWestgate BlvdWendy CresAllingham GdnsBarclay RdSouthbourne AveCollinson BlvdCharleswood DrInvermay AveDelhi AveSouthgate AveBathurst St1234Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (1)
  • Back Water Valve (Sewer only) · Closed · Jul 22, 2013
    Installation of one backwater valve · Permit 13 207835 000

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA19Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M3H1 of 71 above 0.01 ppmYour area · M3HNon Regulated Lead Sample · Feb 12, 2014 to Dec 30, 2024

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    19 Almont Rd · 108 m · Committee of Adjustment · Minor variance · Postponed
    To construct a new second storey addition and a new two storey addition to the rear of the dwelling.
    File A0410/19NY · submitted Jun 6, 2019
  2. 2
    37 Barclay Rd · 126 m · Committee of Adjustment · Minor variance · Prepare Notice
    To construct a new two-storey dwelling. The existing dwelling would be demolished.
    File A1044/16NY · submitted Nov 25, 2016
  3. 3
    26 Invermay Ave · 190 m · Committee of Adjustment · Minor variance · Approved with Conditions
    To construct a new dwelling.
    File A0145/20NY · submitted Feb 27, 2020
  4. 4
    3879 Bathurst St · 248 m · Committee of Adjustment · Minor variance · Hearing Scheduled
    Proposal for interior alterations to existing building to create 2 basement floor bachelor units, alter existing main floor unit into to 2 units, and create a fire escape at the rear of the building. Please note, this application was…
    File A0540/22NY · submitted Jun 29, 2022

Development Applications; Committee of Adjustment Applications · 0 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 17, 2026This addressCollection calendar Tuesday 1
Next recyclingNovember 10, 2026This addressSolid Waste Collection Schedule
City councillorJames PasternakWard 6councillor_pasternak@toronto.ca · 416-392-1371

05Quick answers about 25 Allingham Gdns

Is 25 Allingham Gdns in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 25 Allingham Gdns?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 25 Allingham Gdns?

Collection calendar Tuesday 1. Next garbage pickup: Nov 17, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

25 Allingham Gdns, Toronto — address report · My Address in Toronto