25 Hampton Ave
An address in North Riverdale, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 2 Committee of Adjustment applications within 250 m.
01The building
Recent permits (3)
- Building Permit Related(PS) · Inspection · Dec 3, 2009
Plumbing - Proposal to construct a third floor addition to an existing 2 storey SFD-detached dwelling. Saae also 09 152162 ZAL, 09 152123 MV and Final and Binding A0514/09TEY. · Permit 09 189277 PLB - Addition(s) · Inspection · Dec 3, 2009
Proposal to construct a third floor addition to an existing 2 storey SFD-detached dwelling and 1 third floor balcony. See also 09 152162 ZAL, 09 152123 MV and Final and Binding A0514/09TEY. · Permit 09 189277 BLD - Addition to Existing Building · Inspection · Aug 28, 2000
construct 2nd floor deck addition at rear · Permit 00 165979 000
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 132 Albemarle Ave · 139 m · Committee of Adjustment · Minor variance · DeferredTo construct a two-storey ancillary building (two-car garage with a laneway suite above) in the rear of the property, abutting Penny Lane. The existing shed and gazebo will be demolished. The existing two-storey detached main dwelling on…File A0803/23TEY · submitted Sep 14, 2023
- 225 Sparkhall Ave · 248 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo permit ancillary structures (a raised deck and stairs, a new fence with support braces and a roll-up laneway door (for the existing parking space)). Also, to construct a new ancillary structure (shed) and to maintain the existing shed…File A1369/22TEY · submitted Dec 7, 2022
Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.
04City services
05Quick answers about 25 Hampton Ave
Is 25 Hampton Ave in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 25 Hampton Ave?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 25 Hampton Ave?
Collection calendar Thursday 1. Next garbage pickup: Nov 19, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives






Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location