250 Robert St is in University, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 16 planning applications nearby (eight under review, seven approved, one waiting for a hearing date).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • It is in a Heritage Conservation District (Harbord Village Phase 2) (Part V).
  • Outside TRCA flood hazard areas.
  • 16 planning applications within 250 m: eight under review, seven approved, one waiting for a hearing date.
Building permits0in the last 5 years
Applications nearby16active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
Bloor StHarbord StSpadina AveMajor StBorden StBrunswick AveRobert StHuron StSussex AveGlen Morris StLennox St123456789101112Map data: City of Toronto (Toronto Centreline)Bloor StHarbord StSpadina AveRobert StBrunswick AveMajor StSussex AveGlen Morris StBorden St123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 250 Robert St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 0 on record

The City has no building permits on record for this address. About 9 in 10 Toronto addresses also had none in the last 5 years.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusPart V · Harbord Village Phase 2 HCDThis addressHeritage Register

It is in a Heritage Conservation District (Harbord Village Phase 2) (Part V). Exterior changes and demolition may need a heritage permit.

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5S0% of tests above Ontario's limitYour area · M5SNon Regulated Lead Sample · 167 tests, May 6, 2014 to Aug 11, 2026

In postal area M5S, 0 of 167 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5S is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

16 active planning applications within 250 m (about a 3-minute walk): eight under review, seven approved, one waiting for a hearing date. That's more than at 9 in 10 Toronto addresses.

  1. 1
    250 Robert St · 0 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The hearing was postponed. A new date hasn't been published yet.

    To alter the existing three-storey semi-detached dwelling by constructing a new covered front porch, a rear one and two storey addition (with a basement addition below) at the northwest corner of the dwelling, and a rear third storey…
    File A0628/26TEY · submitted Aug 28, 2026
  2. 2
    425 Bloor St W · 38 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City Council approved it.

    Official Plan and Zoning By-law Amendment application to permit a 30-storey mixed-use building, containing 472 dwelling units and 798 square metres of non-residential gross floor area.
    File 22 216345 STE 11 OZ · submitted Oct 12, 2022 · City record
  3. 3
    425 Bloor St W · 38 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for a 30-storey building with retail units at grade along Bloor Street West. Overall, the proposal will introduce 472 residential units and 798 square metres of retail gross floor area.
    File 22 216344 STE 11 SA · submitted Oct 12, 2022 · City record
  4. 4
    2 Spadina Rd · 67 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Approval for a 36-storey mixed-use building containing 431 residential dwelling units (including 24 rental dwelling replacement units), retail at-grade and in the concourse levels and 2 levels of office space. The site includes…
    File 22 138885 STE 11 SA · submitted Apr 27, 2022 · City record
  5. 5
    2 Spadina Rd · 67 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City Council approved it.

    Zoning By-law Amendment application for a 35-storey mixed-use building, containing 422 dwelling units and 8,200 square metres of non-residential gross floor area. The site includes a TTC entrance to Spadina Station, as well as 470 square…
    File 20 192411 STE 11 OZ · submitted Sep 11, 2020 · City record
  6. 6
    348 Bloor St W · 70 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City Council approved it.

    Zoning By-law Amendment application for a 35-storey mixed-use building, containing 422 dwelling units and 8,200 square metres of non-residential gross floor area. The site includes a TTC entrance to Spadina Station, as well as 470 square…
    File 20 192411 STE 11 OZ · submitted Sep 11, 2020 · City record
  7. 7
    348 Bloor St W · 70 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Approval for a 36-storey mixed-use building containing 431 residential dwelling units (including 24 rental dwelling replacement units), retail at-grade and in the concourse levels and 2 levels of office space. The site includes…
    File 22 138885 STE 11 SA · submitted Apr 27, 2022 · City record
  8. 8
    344 Bloor St W · 70 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Approval for a 36-storey mixed-use building containing 431 residential dwelling units (including 24 rental dwelling replacement units), retail at-grade and in the concourse levels and 2 levels of office space. The site includes…
    File 22 138885 STE 11 SA · submitted Apr 27, 2022 · City record
  9. 9
    344 Bloor St W · 70 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City Council approved it.

    Zoning By-law Amendment application for a 35-storey mixed-use building, containing 422 dwelling units and 8,200 square metres of non-residential gross floor area. The site includes a TTC entrance to Spadina Station, as well as 470 square…
    File 20 192411 STE 11 OZ · submitted Sep 11, 2020 · City record
  10. 10
    350 Bloor St W · 74 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City Council approved it.

    Zoning By-law Amendment application for a 35-storey mixed-use building, containing 422 dwelling units and 8,200 square metres of non-residential gross floor area. The site includes a TTC entrance to Spadina Station, as well as 470 square…
    File 20 192411 STE 11 OZ · submitted Sep 11, 2020 · City record
  11. 11
    350 Bloor St W · 74 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Approval for a 36-storey mixed-use building containing 431 residential dwelling units (including 24 rental dwelling replacement units), retail at-grade and in the concourse levels and 2 levels of office space. The site includes…
    File 22 138885 STE 11 SA · submitted Apr 27, 2022 · City record
  12. 12
    346 Bloor St W · 74 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan Approval for a 36-storey mixed-use building containing 431 residential dwelling units (including 24 rental dwelling replacement units), retail at-grade and in the concourse levels and 2 levels of office space. The site includes…
    File 22 138885 STE 11 SA · submitted Apr 27, 2022 · City record
Short-term rentals nearby6 registered homesWithin 250 mShort Term Rentals Registration

6 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 250 Robert St

Is 250 Robert St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 250 Robert St?

There are 16 active planning applications within 250 metres (eight under review, seven approved, one waiting for a hearing date). The closest is at 250 Robert St, 0 m away. Source: Development Applications; Committee of Adjustment Applications.

Is 250 Robert St a heritage property?

Yes. It is in a Heritage Conservation District (Harbord Village Phase 2) (Part V). Exterior changes and demolition may need a heritage permit. Source: Heritage Register.

When is garbage day at 250 Robert St?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

250 Major Street, looking north to Bloor Street
1910 · 126 m away250 Major Street, looking north to Bloor StreetCity of Toronto Archives, Fonds 1244, Item 7104
Concrete gutter northwest corner of Sussex Avenue and Brunswick Avenue
1890 · 161 m awayConcrete gutter northwest corner of Sussex Avenue and Brunswick AvenueCity of Toronto Archives, Fonds 200, Series 376, File 3, Item 32
Former corner store, 228 Brunswick Avenue, at Sussex Avenue, north-west corner
2003 · 161 m awayFormer corner store, 228 Brunswick Avenue, at Sussex Avenue, north-west cornerCity of Toronto Archives, Fonds 485, Series 2342, File 7, Item 3
Corner of Spadina Ave. and Sussex Ave., looking north-east
1972 · 166 m awayCorner of Spadina Ave. and Sussex Ave., looking north-eastCity of Toronto Archives, Fonds 2032, Series 841, File 55, Item 14
Corner of Spadina Ave. and Sussex Ave., looking south-west
1972 · 166 m awayCorner of Spadina Ave. and Sussex Ave., looking south-westCity of Toronto Archives, Fonds 2032, Series 841, File 55, Item 12
Corner of Spadina Ave. and Sussex Ave., looking north-west
1972 · 166 m awayCorner of Spadina Ave. and Sussex Ave., looking north-westCity of Toronto Archives, Fonds 2032, Series 841, File 55, Item 13
Corner of Spadina Ave. and Sussex Ave., looking south-east
1972 · 166 m awayCorner of Spadina Ave. and Sussex Ave., looking south-eastCity of Toronto Archives, Fonds 2032, Series 841, File 55, Item 11
Corner of Spadina Ave. and Glen Morris St., looking north-east
1972 · 183 m awayCorner of Spadina Ave. and Glen Morris St., looking north-eastCity of Toronto Archives, Fonds 2032, Series 841, File 55, Item 16
Corner of Spadina Ave. and Glen Morris St., looking south-east
1972 · 183 m awayCorner of Spadina Ave. and Glen Morris St., looking south-eastCity of Toronto Archives, Fonds 2032, Series 841, File 55, Item 15

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location