255 Dundas St E is in Moss Park, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 16 planning applications nearby (14 under review, two approved).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • It is in a Heritage Conservation District (Garden District) (Part V).
  • Outside TRCA flood hazard areas.
  • 16 planning applications within 250 m: 14 under review, two approved.
Building permits0in the last 5 years
Applications nearby16active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 11recycling and green bin
Dundas StJarvis StSherbourne StShuter StDalhousie StMutual StGeorge StGould StPembroke StMilan StOntario StSeaton StBerkeley St123456789101112Map data: City of Toronto (Toronto Centreline)Jarvis StDundas StSherbourne StShuter StMutual StPembroke StGeorge StSeaton St123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 255 Dundas St E. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone open (1 closed)This addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 7 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusPart V · Garden District HCDThis addressHeritage Register

It is in a Heritage Conservation District (Garden District) (Part V). Exterior changes and demolition may need a heritage permit.

Permit history: 2 projects from 7 permits
  • Interior Alterations · completed Mar 25, 2025
    Proposal for interior alterations on the ground floor of Unit 1, "Papa Johns Pizza" · 2 permits in this project (such as building, plumbing and heating) · Permit 14 240474
  • Interior Alterations · completed Mar 25, 2025
    Revision # 02 - To block off the stairs from the ground floor to the basement and to replace glass wall with a masonry wall at the rear.Revision to add a commercial unit on the ground floor.… · 5 permits in this project (such as building, plumbing and heating) · Permit 08 200713

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5A3.0% of tests above Ontario's limitYour area · M5ANon Regulated Lead Sample · 134 tests, May 21, 2014 to Oct 15, 2026

In postal area M5A, 4 of 134 home tap-water samples (3.0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5A is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 9 samples here (6.7%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

16 active planning applications within 250 m (about a 3-minute walk): 14 under review, two approved. That's more than at 9 in 10 Toronto addresses.

  1. 1
    294 Sherbourne St · 47 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.
    File 21 230765 STE 13 CD · submitted Oct 26, 2021 · City record
  2. 2
    296 Sherbourne St · 57 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.
    File 21 230765 STE 13 CD · submitted Oct 26, 2021 · City record
  3. 3
    298 Sherbourne St · 64 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.
    File 21 230765 STE 13 CD · submitted Oct 26, 2021 · City record
  4. 4
    307 Sherbourne St · 131 m away
    Site Plan: City review of the design and layout of a new building

    City planners approved the site plan, with conditions to meet before a building permit.

    Site Plan Control application for a 15-storey residential building consisting of 192 residential units with a total gross floor area of 7,853 square metres, 4 parking spaces.
    File 18 213029 STE 28 SA · submitted Aug 21, 2018 · City record
  5. 5
    319 George St · 142 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
  6. 6
    315 George St · 150 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
  7. 7
    325 George St · 151 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
  8. 8
    335 George St · 154 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
  9. 9
    345 George St · 159 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
  10. 10
    339 George St · 162 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
  11. 11
    349 George St · 167 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
  12. 12
    309 George St · 168 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…
    File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
Short-term rentals nearby295 registered homesWithin 250 mShort Term Rentals Registration

295 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.

City councillorChris MoiseWard 13Councillor_Moise@toronto.ca · 416-392-7903

05Quick answers about 255 Dundas St E

Is 255 Dundas St E in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 255 Dundas St E?

There are 16 active planning applications within 250 metres (14 under review, two approved). The closest is at 294 Sherbourne St, 47 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 255 Dundas St E been renovated?

Yes. The City has 7 building permits on record, 0 in the last 5 years. Source: Building Permits.

Is 255 Dundas St E a heritage property?

Yes. It is in a Heritage Conservation District (Garden District) (Part V). Exterior changes and demolition may need a heritage permit. Source: Heritage Register.

When is garbage day at 255 Dundas St E?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Corner of Pembroke St. north of Dundas St., looking east
1972 · 28 m awayCorner of Pembroke St. north of Dundas St., looking eastCity of Toronto Archives, Fonds 2032, Series 841, File 18, Item 32
View of rear of house on Dundas Street East, from Pembroke Street
1978 · 28 m awayView of rear of house on Dundas Street East, from Pembroke StreetCity of Toronto Archives, Fonds 1526, File 9, Item 26
Corner of Pembroke St. and Dundas St., looking south-west
1972 · 28 m awayCorner of Pembroke St. and Dundas St., looking south-westCity of Toronto Archives, Fonds 2032, Series 841, File 69, Item 5
View of the north-west corner of Dundas Street East and Pembroke Street
1977 · 28 m awayView of the north-west corner of Dundas Street East and Pembroke StreetCity of Toronto Archives, Fonds 1526, File 9, Item 19
Corner of Pembroke St. and Dundas St., looking north-west
1972 · 28 m awayCorner of Pembroke St. and Dundas St., looking north-westCity of Toronto Archives, Fonds 2032, Series 841, File 18, Item 26
Corner of Pembroke St. and Dundas St., looking north-east
1972 · 28 m awayCorner of Pembroke St. and Dundas St., looking north-eastCity of Toronto Archives, Fonds 2032, Series 841, File 18, Item 30
Corner of Pembroke St. and Dundas St., looking south-west
1972 · 28 m awayCorner of Pembroke St. and Dundas St., looking south-westCity of Toronto Archives, Fonds 2032, Series 841, File 18, Item 29
Corner of Pembroke St. north of Dundas St., looking west
1972 · 28 m awayCorner of Pembroke St. north of Dundas St., looking westCity of Toronto Archives, Fonds 2032, Series 841, File 18, Item 31
View of houses on Dundas Street, north-west corner of Pembroke Street
1977 · 28 m awayView of houses on Dundas Street, north-west corner of Pembroke StreetCity of Toronto Archives, Fonds 1526, File 9, Item 10

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

255 Dundas St E, Toronto M5A: permits, flood risk and what's planned nearby · My Address in Toronto