26 Statler Ave
26 Statler Ave is in Islington. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (two under review, one deferred, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 4 planning applications within 250 m: two under review, one deferred, one waiting for a hearing date.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 2 permits
- Accessory Building(s) · completed Feb 23, 2026
To construct a rear pool cabana with kitchen and washroom and mechanical room · 2 permits in this project (such as building, plumbing and heating) · Permit 21 176487
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M9B, 3 of 121 home tap-water samples (2.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M9B is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 4 samples here (3.3%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
4 active planning applications within 250 m (about a 3-minute walk): two under review, one deferred, one waiting for a hearing date. That's about typical for Toronto (the typical address has 1).
- 13927 Bloor St W · 45 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal to demolish the existing two-storey dwellings on each lot, and to consolidate the lots to construct a six-storey (19.5 metres), 3,613.5 square-metre, purpose-built rental building containing 52 residential units.File 25 270220 WET 03 SA · submitted Dec 29, 2025 · City record - 23925 Bloor St W · 57 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal to demolish the existing two-storey dwellings on each lot, and to consolidate the lots to construct a six-storey (19.5 metres), 3,613.5 square-metre, purpose-built rental building containing 52 residential units.File 25 270220 WET 03 SA · submitted Dec 29, 2025 · City record - 316 Downing St · 172 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a detached garage in the rear yard.File A0111/26EYK · submitted Mar 11, 2026 - 43925 Bloor St W · 229 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
To construct a new 6-storey apartment building containing a total of 52 dwelling units.File A0290/26EYK · submitted Sep 3, 2026
1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 26 Statler Ave
Is 26 Statler Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 26 Statler Ave?
There are 4 active planning applications within 250 metres (two under review, one deferred, one waiting for a hearing date). The closest is at 3927 Bloor St W, 45 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 26 Statler Ave been renovated?
Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 26 Statler Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 26 Statler Ave?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location