260 Doris Ave
260 Doris Ave is in Yonge-Doris. It's outside TRCA flood hazard areas and there are 21 planning applications nearby (five approved by the tribunal, five under review, four under appeal, seven others).
Data as of Nov 8, 2026 · Every item lists its source
- No fire code violations in open inspections.
- 1 open building order from the City.
- Outside TRCA flood hazard areas.
- 21 planning applications within 250 m: five approved by the tribunal, five under review, four under appeal, seven others.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Sprinklers · inspection · issued Oct 26, 2020
New Fire Sprinkler System for existing Apartment Building Lobby and Recycling areas · Permit 20 206868
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M2N, 1 of 133 home tap-water samples (0.8%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M2N is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (0.8%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
21 active planning applications within 250 m (about a 3-minute walk): five approved by the tribunal, five under review, four under appeal, seven others. That's more than at almost all Toronto addresses.
- 156 Parkview Ave · 151 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved with conditions it on Aug 24, 2023.
To construct a new detached dwelling. Please note, the application was previously deferred on April 13. 2023, to allow the applicant to consult with City Planning staff.File A0118/23NY · submitted Mar 2, 2023 - 272 Church Ave · 152 m awaySite Plan: City review of the design and layout of a new building
City planners approved the site plan, with conditions to meet before a building permit.
Revised: A four storey residential purpose built rental building containing 14 residential units (4 studeio and one-bedroom units, 7 two-bedroom and 3- three bedroom units) and one level of underground parking that contains 8 parking…File 14 259884 NNY 23 SA · submitted Dec 3, 2014 · City record - 356 Norton Ave · 155 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Feb 9, 2017.
To construct a new detached two-storey dwelling with an integral garage. The existing dwelling would be demolished. Applications B0071/15NY, B0014/16NY, A1129/15NY, A1130/15NY, A0260/16NY will be considered jointly.File A0260/16NY · submitted Mar 11, 2016 - 456 Norton Ave · 155 m awayCommittee of Adjustment · Consent (severance): permission to split a lot or change property lines
The Committee of Adjustment refused it on Feb 9, 2017. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
To obtain consent to sever a portion of the land for the purpose of a lot addition to create a new building lot.File B0014/16NY · submitted Mar 11, 2016 - 563 Norton Ave · 200 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
To construct a new two-storey dwelling with an integral, at-grade, two car garage. The existing dwelling would be demolished. Please note, a previous application (File # 854/12NY) with respect to the subject property was APPROVED on…File A365/14NY · submitted May 7, 2014 - 65330-5334 Yonge St · 202 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
The Ontario Land Tribunal (formerly the OMB) approved it.
Official Plan Amendment, Zoning By-law Amendment and Site Plan Control applications for a mixed use development with a 45 storey building along the Yonge Street frontage and a 33 storey building along Canterbury Place, with a total of 862…File 22 193284 NNY 18 OZ · submitted Aug 19, 2022 · City record - 75330-5334 Yonge St · 202 m awaySite Plan: City review of the design and layout of a new building
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposal for a 36 storey mixed use building with 2 to 7 storey podium along the Yonge Street frontage with a 12 storey building component located along Canterbury Place. The proposed GFA is 38,036 m2 (FSI 10.3) include 36,278 m2…File 22 193283 NNY 18 SA · submitted Aug 19, 2022 · City record - 85320 Yonge St · 203 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
The Ontario Land Tribunal (formerly the OMB) approved it.
Official Plan Amendment, Zoning By-law Amendment and Site Plan Control applications for a mixed use development with a 45 storey building along the Yonge Street frontage and a 33 storey building along Canterbury Place, with a total of 862…File 22 193284 NNY 18 OZ · submitted Aug 19, 2022 · City record - 95320-5324 Yonge St · 210 m awaySite Plan: City review of the design and layout of a new building
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposal for a 36 storey mixed use building with 2 to 7 storey podium along the Yonge Street frontage with a 12 storey building component located along Canterbury Place. The proposed GFA is 38,036 m2 (FSI 10.3) include 36,278 m2…File 22 193283 NNY 18 SA · submitted Aug 19, 2022 · City record - 105320-5324 Yonge St · 210 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
The Ontario Land Tribunal (formerly the OMB) approved it.
Official Plan Amendment, Zoning By-law Amendment and Site Plan Control applications for a mixed use development with a 45 storey building along the Yonge Street frontage and a 33 storey building along Canterbury Place, with a total of 862…File 22 193284 NNY 18 OZ · submitted Aug 19, 2022 · City record - 115400 Yonge St · 213 m awayCondominium: a request to divide a building into condominium units
City planners are reviewing it. Residents can comment before a decision is made.
*** 433 dwelling unitsFile 21 235477 NNY 18 CD · submitted Nov 8, 2021 · City record - 125400 Yonge St · 213 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan application for a 32-storey residential tower comprised of 533 dwelling units with a 4-storey mixed residential and retail podium.File 21 252165 NNY 18 SA · submitted Dec 30, 2021 · City record
5 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: garbage, green bin and yard waste. November 20: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 260 Doris Ave
Is 260 Doris Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
Does 260 Doris Ave have open fire code violations?
No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.
What is being built near 260 Doris Ave?
There are 21 active planning applications within 250 metres (five approved by the tribunal, five under review, four under appeal, seven others). The closest is at 56 Parkview Ave, 151 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 260 Doris Ave been renovated?
Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.
Is 260 Doris Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 260 Doris Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 13, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives




Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location