283 Dundas St E
283 Dundas St E is in Moss Park, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 14 planning applications nearby (12 under review, two approved).
Data as of Nov 8, 2026 · Every item lists its source
- It is in a Heritage Conservation District (Garden District) (Part V).
- Outside TRCA flood hazard areas.
- 14 planning applications within 250 m: 12 under review, two approved.
03The building
The City has no building permits on record for this address. About 9 in 10 Toronto addresses also had none in the last 5 years.
It is in a Heritage Conservation District (Garden District) (Part V). Exterior changes and demolition may need a heritage permit.
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5A, 4 of 134 home tap-water samples (3.0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5A is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 9 samples here (6.7%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
14 active planning applications within 250 m (about a 3-minute walk): 12 under review, two approved. That's more than at 9 in 10 Toronto addresses.
- 1294 Sherbourne St · 84 m awayCondominium: a request to divide a building into condominium units
City planners are reviewing it. Residents can comment before a decision is made.
*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.File 21 230765 STE 13 CD · submitted Oct 26, 2021 · City record - 2296 Sherbourne St · 92 m awayCondominium: a request to divide a building into condominium units
City planners are reviewing it. Residents can comment before a decision is made.
*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.File 21 230765 STE 13 CD · submitted Oct 26, 2021 · City record - 3298 Sherbourne St · 97 m awayCondominium: a request to divide a building into condominium units
City planners are reviewing it. Residents can comment before a decision is made.
*** Draft Plan of Condominium for one residential unit and one commercial unit within the proposed 10-storey student residence building.File 21 230765 STE 13 CD · submitted Oct 26, 2021 · City record - 4307 Sherbourne St · 117 m awaySite Plan: City review of the design and layout of a new building
City planners approved the site plan, with conditions to meet before a building permit.
Site Plan Control application for a 15-storey residential building consisting of 192 residential units with a total gross floor area of 7,853 square metres, 4 parking spaces.File 18 213029 STE 28 SA · submitted Aug 21, 2018 · City record - 5211 Gerrard St E · 130 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.File 25 187962 STE 13 SA · submitted Jul 4, 2025 · City record - 6213 Gerrard St E · 134 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.File 25 187962 STE 13 SA · submitted Jul 4, 2025 · City record - 7219 Gerrard St E · 135 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.File 25 187962 STE 13 SA · submitted Jul 4, 2025 · City record - 8227 Gerrard St E · 157 m awayCondominium: a request to divide a building into condominium units
It has been approved.
**** Draft Plan of Condominium for 107 units.File 21 230939 STE 13 CD · submitted Oct 27, 2021 · City record - 9319 George St · 231 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record - 10315 George St · 239 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record - 11325 George St · 240 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record - 12335 George St · 242 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal…File 25 239940 STE 13 OZ · submitted Oct 15, 2025 · City record
20 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 283 Dundas St E
Is 283 Dundas St E in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 283 Dundas St E?
There are 14 active planning applications within 250 metres (12 under review, two approved). The closest is at 294 Sherbourne St, 84 m away. Source: Development Applications; Committee of Adjustment Applications.
Is 283 Dundas St E a heritage property?
Yes. It is in a Heritage Conservation District (Garden District) (Part V). Exterior changes and demolition may need a heritage permit. Source: Heritage Register.
When is garbage day at 283 Dundas St E?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location