03The building
1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 1 permit
- Back Water Valve (Sewer only) · inspection · issued Mar 19, 2024
Installation of a backwater valve and sump pump on the main sanitary Sewer · Permit 24 126677
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4C, 21 of 851 home tap-water samples (2.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4C is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 58 samples here (6.8%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
2 active planning applications within 250 m (about a 3-minute walk): both deferred. That's about typical for Toronto (the typical address has 1).
- 169 Oak Park Ave · 153 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To construct a one-storey ancillary building (containing one garden suite) in the rear yard, with a basement level, a front (west) ground floor porch porch with stairs, a front (west) basement window well, and a side (north) ground floor…File A0395/25TEY · submitted May 27, 2025 - 272 Keystone Ave · 241 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
To alter the existing two-storey semi-detached dwelling by constructing a front three-storey addition, a new front porch with canopy, a rear two-storey addition, a partial third storey addition with a rear balcony (above the rear…File A0256/26TEY · submitted Mar 31, 2026
9 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 29 Gates Ave
Is 29 Gates Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 29 Gates Ave?
There are 2 active planning applications within 250 metres (both deferred). The closest is at 69 Oak Park Ave, 153 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 29 Gates Ave been renovated?
Yes. The City has 1 building permit on record, 1 in the last 5 years. Source: Building Permits.
Is 29 Gates Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 29 Gates Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives




Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location