Skip to content
My Address in Toronto
Address report

2903 St Clair Ave E

A registered apartment building built in 1960 with a RentSafe score of 93, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • RentSafe evaluation score of 93 out of 100 (evaluated Jul 28, 2026).
  • Outside TRCA flood and shoreline hazard areas.
  • 0 active development applications and 3 Committee of Adjustment applications within 250 m.
RentSafe score93out of 100
Fire code violations—no inspection records
Applications3active within 250 m
Flood hazardOutsideTRCA mapping
Cedarcrest BlvdSquires AveGlencrest BlvdGlenburn AveFerris RdHolmstead AveGlen Eden CresSelwyn AveGlenfield CresPlaxton DrMerritt RdWarvet CresVicross RdValor BlvdFurnival RdSt Clair Ave E123Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluation93 / 100This addressApartment Building Evaluation · evaluated Jul 28, 2026
Building3 storeys · 12 units · built 1960This addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 2 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (2)
  • Sprinklers · Inspection · Oct 13, 2015
    Proposal to add sprinklers to existing apartment building · Permit 15 219506 FSU
  • Other(PS) · Work Not Started · Jul 23, 2009
    Proposal to replace leaking pipes from galvanized line to copper. (No fixtures being added) · Permit 09 144394 PSA

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA1Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M4B2 of 94 above 0.01 ppmYour area · M4BNon Regulated Lead Sample · Mar 8, 2014 to Aug 4, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    2915 St Clair Ave E · 79 m · Committee of Adjustment · Minor variance · Postponed
    Proposing to add a vehicle dealership that would use 3/7 parking spaces on the existing lot. The existing autobody repair shop is a legal non-conforming use.
    File A1217/22TEY · submitted Oct 3, 2022
  2. 2
    68 Glencrest Blvd · 88 m · Committee of Adjustment · Minor variance · Approved with Conditions
    To alter the existing one-storey ancillary building (detached garage, abutting Glencrest Boulevard and Squires Avenue) by constructing a second storey addition to contain a garden suite. There will be an exterior staircase along the north…
    File A0959/23TEY · submitted Oct 20, 2023
  3. 3
    8 Holmstead Ave · 197 m · Committee of Adjustment · Consent (severance) · Conditional Consent
    To obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.
    File B0041/25TEY · submitted Jun 19, 2025

Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 12, 2026This addressCollection calendar Thursday 2
Next recyclingNovember 19, 2026This addressSolid Waste Collection Schedule
City councillorBrad BradfordWard 19councillor_bradford@toronto.ca · 416-338-2755

05Quick answers about 2903 St Clair Ave E

Is 2903 St Clair Ave E in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 2903 St Clair Ave E?

0 active development applications within 250 metres. Source: Development Applications.

When is garbage day at 2903 St Clair Ave E?

Collection calendar Thursday 2. Next garbage pickup: Nov 12, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

2903 St Clair Ave E, Toronto — address report · My Address in Toronto