292 Main St
292 Main St is in East End-Danforth, on the City's Heritage Register. It's outside TRCA flood hazard areas and there are 6 planning applications nearby (five approved, one under appeal).
Data as of Nov 8, 2026 · Every item lists its source
- It is individually designated under the Ontario Heritage Act (Part IV).
- Outside TRCA flood hazard areas.
- 6 planning applications within 250 m: five approved, one under appeal.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It is individually designated under the Ontario Heritage Act (Part IV). Changes to its heritage features need a heritage permit from the City.
Permit history: 2 projects from 2 permits
- Interior Alterations · inspection · issued Dec 18, 2020
INTERIOR ALTERATION - Proposal for interior alteration to an existing heritage house that will be relocated 18m north to 294 Main Street. See file (20-214860 BLD 00 BA) for foundation wall. · Permit 20 214828 - Demolition · completed Aug 24, 2025
Demolition of small garage at rear of 292 Main Street . Does not include doctors office at 292 Main St which will be protected and moved as part of the development. · Permit 20 138200
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4C, 21 of 851 home tap-water samples (2.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4C is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 58 samples here (6.8%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
6 active planning applications within 250 m (about a 3-minute walk): five approved, one under appeal. That's more than at most Toronto addresses (the typical address has 1).
- 12575 Danforth Ave · 192 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Rezoning application to redevelop certain portions of this large 3.18-hectare property with five new buildings (Buildings E to I) ranging in height from 15 to 55-storeys and accommodating approximately 1,543 new residential units, with a…File 22 196279 STE 19 OZ · submitted Aug 26, 2022 · City record - 2294 Main St · 212 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Standard Condominium for 5 retail condominium units.File 26 128251 STE 19 CD · submitted Mar 11, 2026 · City record - 3292 Main St · 222 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Standard Condominium for 5 retail condominium units.File 26 128251 STE 19 CD · submitted Mar 11, 2026 · City record - 4290 Main St · 230 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Standard Condominium for 5 retail condominium units.File 26 128251 STE 19 CD · submitted Mar 11, 2026 · City record - 5286 Main St · 232 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Standard Condominium for 5 retail condominium units.File 26 128251 STE 19 CD · submitted Mar 11, 2026 · City record - 6284 Main St · 243 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Standard Condominium for 5 retail condominium units.File 26 128251 STE 19 CD · submitted Mar 11, 2026 · City record
2 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 292 Main St
Is 292 Main St in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 292 Main St?
There are 6 active planning applications within 250 metres (five approved, one under appeal). The closest is at 2575 Danforth Ave, 192 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 292 Main St been renovated?
Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 292 Main St a heritage property?
Yes. It is individually designated under the Ontario Heritage Act (Part IV). Changes to its heritage features need a heritage permit from the City. Source: Heritage Register.
When is garbage day at 292 Main St?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives








Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location