2929 Bathurst St is in Bedford Park-Nortown, in a registered apartment building built in 1960 with 10 units. It's outside TRCA flood hazard areas and there are 10 planning applications nearby (four under review, three approved, two deferred, one other).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • This building scored 92 out of 100 when last evaluated (Jul 22, 2026). That's lower than 56% of evaluated buildings in Toronto.
  • Outside TRCA flood hazard areas.
  • 10 planning applications within 250 m: four under review, three approved, two deferred, one other.
RentSafe score92out of 100
Fire code violations—no inspection records
Applications nearby10active, within 250 m
Flood hazardOutsideTRCA mapping
Bathurst StGlenmount AveGlen Rush BlvdForest WoodGlengrove AveColdstream AveFairholme AveFrontenac AveCaribou RdShelborne Ave12345678910Map data: City of Toronto (Toronto Centreline)Bathurst StForest WoodColdstream AveFrontenac AveCaribou RdGlengrove AveGlen Rush Blvd12345678910Map data: City of Toronto (Toronto Centreline)
The red dot is 2929 Bathurst St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

01The building

ItemFindingPrecisionSource
RentSafe evaluation92 / 100This addressApartment Building Evaluation · evaluated Jul 22, 2026

RentSafe is the City's inspection program for apartment buildings with 3+ storeys and 10+ units. This building scored 92 out of 100 when last evaluated (Jul 22, 2026). That's lower than 56% of evaluated buildings in Toronto.

Building3 storeys · 10 units · built 1960This addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 0 on record

The City has no building permits on record for this address. About 9 in 10 Toronto addresses also had none in the last 5 years.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

02Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5N1.3% of tests above Ontario's limitYour area · M5NNon Regulated Lead Sample · 152 tests, Jan 22, 2014 to Aug 5, 2026

In postal area M5N, 2 of 152 home tap-water samples (1.3%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5N is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.3%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. Buildings with more than six units don't have lead service pipes.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

10 active planning applications within 250 m (about a 3-minute walk): four under review, three approved, two deferred, one other. That's more than at 9 in 10 Toronto addresses.

  1. 1
    138 Shelborne Ave · 166 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The City has received it. A hearing date hasn't been set yet.

    To construct a second storey addition over the existing one-storey dwelling, in conjunction with other interior and exterior alterations. Please note, this application was previously deferred Thursday, January 26, 2017, in order to allow…
    File A1013/16NY · submitted Nov 18, 2016
  2. 2
    515 Coldstream Ave · 180 m away
    Committee of Adjustment · Consent (severance): permission to split a lot or change property lines

    The Committee of Adjustment approved it on Oct 26, 2023.

    To obtain consent to sever a portion of the land for the purpose of a lot addition. There are no associated minor variance applications. This application was previously deferred on July 13th to make changes to the conveyed and retained…
    File B0012/23NY · submitted Apr 28, 2023
  3. 3
    3090 Bathurst St · 225 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  4. 4
    463 Coldstream Ave · 227 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Aug 3, 2017.

    To construct a new playroom under existing rear patio.
    File A0507/17NY · submitted May 15, 2017
  5. 5
    507 Glengrove Ave · 234 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment approved it on Aug 29, 2019.

    To construct a new dwelling.
    File A0500/19NY · submitted Jul 11, 2019
  6. 6
    3094 Bathurst St · 237 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  7. 7
    3102 Bathurst St · 243 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  8. 8
    186 Caribou Rd · 244 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The hearing was postponed. A new date hasn't been published yet.

    To permit a surface parking lot. The site comprises all of 186 Caribou Road, currently occupied by a single detached dwelling, as well as an existing easement over the rear of properties municipally known as 3011-3019 Bathurst Street,…
    File A0210/17NY · submitted Mar 3, 2017
  9. 9
    186 Caribou Rd · 244 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The hearing was postponed. A new date hasn't been published yet.

    To permit a surface parking lot. The site comprises all of 186 Caribou Road, currently occupied by a single detached dwelling, as well as an existing easement over the rear of properties municipally known as 3011-3019 Bathurst Street,…
    File A0211/17NY · submitted Mar 3, 2017
  10. 10
    3102 B Bathurst St · 248 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
Short-term rentals nearby1 registered homeWithin 250 mShort Term Rentals Registration

1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

04City services

ItemFindingPrecisionSource
Garbage and recyclingThursdaysThis addressSolid Waste Collection Schedule

Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorMike ColleWard 8councillor_colle8@toronto.ca · 416-338-2500

05Quick answers about 2929 Bathurst St

Is 2929 Bathurst St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 2929 Bathurst St?

There are 10 active planning applications within 250 metres (four under review, three approved, two deferred, one other). The closest is at 138 Shelborne Ave, 166 m away. Source: Development Applications; Committee of Adjustment Applications.

Is 2929 Bathurst St a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 2929 Bathurst St?

Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.