2948 St Clair Ave E
An address in O'Connor-Parkview, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 7, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
- 0 active development applications and 3 Committee of Adjustment applications within 250 m.
01The building
Recent permits (5)
- Building Permit Related(MS) · Inspection · May 14, 2012
HVAC - permit for interior alterations to ground floor - complete new second floor addition and deck at rear of existing SFD detached dwelling. · Permit 11 269812 HVA - Multiple Projects · Revision Issued · May 3, 2012
Revision: Multiple alteratons.REVISION: This is a revision to the second floor addition to make the second floor addition at the rear larger.permit for interior alterations to ground floor -… · Permit 11 269812 BLD - Multiple Projects · Revision Issued · Dec 15, 2011
REVISION: This is a revision to the second floor addition to make the second floor addition at the rear larger.permit for interior alterations to ground floor - complete new second floor addition… · Permit 11 269812 BLD - Multiple Projects · Inspection · Sep 27, 2011
permit for interior alterations to ground floor - complete new second floor addition and deck at rear of existing SFD detached dwelling. · Permit 11 269812 BLD - Building Permit Related(PS) · Inspection · Sep 27, 2011
Plumbing - permit for interior alterations to ground floor - complete new second floor addition and deck at rear of existing SFD detached dwelling. · Permit 11 269812 PLB
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 18 Holmstead Ave · 103 m · Committee of Adjustment · Consent (severance) · Conditional ConsentTo obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.File B0041/25TEY · submitted Jun 19, 2025
- 22915 St Clair Ave E · 122 m · Committee of Adjustment · Minor variance · PostponedProposing to add a vehicle dealership that would use 3/7 parking spaces on the existing lot. The existing autobody repair shop is a legal non-conforming use.File A1217/22TEY · submitted Oct 3, 2022
- 368 Glencrest Blvd · 169 m · Committee of Adjustment · Minor variance · Approved with ConditionsTo alter the existing one-storey ancillary building (detached garage, abutting Glencrest Boulevard and Squires Avenue) by constructing a second storey addition to contain a garden suite. There will be an exterior staircase along the north…File A0959/23TEY · submitted Oct 20, 2023
Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.
04City services
05Quick answers about 2948 St Clair Ave E
Is 2948 St Clair Ave E in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 2948 St Clair Ave E?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 2948 St Clair Ave E?
Collection calendar Thursday 2. Next garbage pickup: Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location