Skip to content
My Address in Toronto
Address report

2953 Bathurst St

2953 Bathurst St is in Bedford Park-Nortown. It's outside TRCA flood hazard areas and there are 15 planning applications nearby (ten under review, two deferred, one under appeal after a refusal, two others).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 15 planning applications within 250 m: ten under review, two deferred, one under appeal after a refusal, two others.
Building permits1in the last 5 years
Applications nearby15active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 12garbage, green bin and yard waste
Lawrence AveBathurst StGlenmount AveDell Park AveGlen Rush BlvdFrontenac AveStormont AveFairholme AveCaribou RdShelborne Ave123456789101112Map data: City of Toronto (Toronto Centreline)Bathurst StStormont AveCaribou RdGlengrove AveShelborne AveGlen Rush Blvd123456789101112Map data: City of Toronto (Toronto Centreline)
The red dot is 2953 Bathurst St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 13 on record

1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 6 projects from 13 permits
  • Interior Alterations · inspection · issued Sep 3, 2025
    Proposal for interior alteration of an existing basement washroom in a BMO branch. · Permit 25 214441
  • Interior renovation · completed Jun 27, 2022
    Proposed construction of a new bridge connection and interior alterations the second floor to convert the existing bank office use into classrooms. · 3 permits in this project (such as building, plumbing and heating) · Permit 20 171316
  • Interior Alterations · completed Jun 11, 2025
    Proposed interior alterations to the second floor · 2 permits in this project (such as building, plumbing and heating) · Permit 19 175011
  • Sign Building Permit Related · completed Sep 18, 2019
    In conjunction with a two storey building on the premises, proposal to erect and display two illuminated wall signs, all displaying static copy. The wall sign on the second storey of the north… · Permit 19 117147
  • Interior Alterations · completed Jun 11, 2025
    Rev 01 - Retain existing floor slab on ground floor and reinforce from below. Remove earlier proposed rooftop condensing unit and associated reinforcement of existing OWSJs on second floor. Retain… · 5 permits in this project (such as building, plumbing and heating) · Permit 18 249912
  • Backflow Prevention Devices (Water only) · completed May 24, 2019
    Backflow Prevention Devices · Permit 16 110584

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M6B0% of tests above Ontario's limitYour area · M6BNon Regulated Lead Sample · 76 tests, Apr 24, 2014 to Sep 19, 2026

In postal area M6B, 0 of 76 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6B is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

15 active planning applications within 250 m (about a 3-minute walk): ten under review, two deferred, one under appeal after a refusal, two others. That's more than at 9 in 10 Toronto addresses.

  1. 1
    186 Caribou Rd · 145 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The hearing was postponed. A new date hasn't been published yet.

    To permit a surface parking lot. The site comprises all of 186 Caribou Road, currently occupied by a single detached dwelling, as well as an existing easement over the rear of properties municipally known as 3011-3019 Bathurst Street,…
    File A0210/17NY · submitted Mar 3, 2017
  2. 2
    186 Caribou Rd · 145 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The hearing was postponed. A new date hasn't been published yet.

    To permit a surface parking lot. The site comprises all of 186 Caribou Road, currently occupied by a single detached dwelling, as well as an existing easement over the rear of properties municipally known as 3011-3019 Bathurst Street,…
    File A0211/17NY · submitted Mar 3, 2017
  3. 3
    3090 Bathurst St · 149 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  4. 4
    3094 Bathurst St · 158 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  5. 5
    3102 Bathurst St · 163 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  6. 6
    3102 B Bathurst St · 167 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  7. 7
    3104 Bathurst St · 171 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  8. 8
    3106 Bathurst St · 176 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  9. 9
    3110 Bathurst St · 179 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
  10. 10
    178 Caribou Rd · 179 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Jun 25, 2014. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To construct a new three-storey dwelling, with an integral, at-grade two car garage. The existing dwelling would be demolished.
    File A295/14NY · submitted Apr 16, 2014
  11. 11
    138 Shelborne Ave · 181 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The City has received it. A hearing date hasn't been set yet.

    To construct a second storey addition over the existing one-storey dwelling, in conjunction with other interior and exterior alterations. Please note, this application was previously deferred Thursday, January 26, 2017, in order to allow…
    File A1013/16NY · submitted Nov 18, 2016
  12. 12
    3112 Bathurst St · 182 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    City planners are reviewing it. Residents can comment before a decision is made.

    Zoning By-law Amendment proposing seven 12 to 40-storey mixed-use towers and a 6-storey mid-rise building. 2,693 dwelling units are proposed with two levels of below-grade parking, providing a total of 1298 parking spaces and 2072 bicycle…
    File 25 173118 NNY 08 OZ · submitted Jun 6, 2025 · City record
Short-term rentals nearby1 registered homeWithin 250 mShort Term Rentals Registration

1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingThursdaysThis addressSolid Waste Collection Schedule

Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorMike ColleWard 8councillor_colle8@toronto.ca · 416-338-2500

05Quick answers about 2953 Bathurst St

Is 2953 Bathurst St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 2953 Bathurst St?

There are 15 active planning applications within 250 metres (ten under review, two deferred, one under appeal after a refusal, two others). The closest is at 186 Caribou Rd, 145 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 2953 Bathurst St been renovated?

Yes. The City has 13 building permits on record, 1 in the last 5 years. Source: Building Permits.

Is 2953 Bathurst St a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 2953 Bathurst St?

Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

2953 Bathurst St, Toronto M6B: permits, flood risk and what's planned nearby · My Address in Toronto