299 Augusta Ave
299 Augusta Ave is in Kensington-Chinatown. It's outside TRCA flood hazard areas and there are 8 planning applications nearby (three under review, three approved, one waiting for a hearing date, one other).
Data as of Nov 8, 2026 · Every item lists its source
- No fire code violations in open inspections.
- 7 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
- 8 planning applications within 250 m: three under review, three approved, one waiting for a hearing date, one other.
03The building
7 building permits in the last 5 years, for 3 projects. Together they added 4 new homes. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 5 projects from 22 permits
- Interior Alterations · completed Dec 9, 2024
Proposed interior alterations including associated mechanical, electrical, plumbing and structural work. · 3 permits in this project (such as building, plumbing and heating) · Permit 24 142800 - Interior Alterations · completed May 10, 2024
Proposed interior retrofit to the existing second floor office suite for new tenant.Tenant: Bluebird Laser Hair Removal · 3 permits in this project (such as building, plumbing and heating) · Permit 23 226346 - Interior Alterations · inspection · issued Jun 9, 2023
New restaurant/bar alterations from existing bar/brewery. Infill open floor area and reduce occupant load to 30 patrons. · Permit 23 111609 - Interior Alterations · completed Jul 9, 2019
Additional restaurant/eating establishment use proposed to previously approved Brew on Premises, under Building Permit No. 13 117254 BLD 01 BA. (Restaurant and Brew on premises with beer production… · 5 permits in this project (such as building, plumbing and heating) · Permit 15 251221 - Building work · completed Feb 14, 2018
REVISION - 02 Updated drawings for this permit as per building inspectors request (as built condition) for change of use in related permit 15 251221 for eating establishment complete with accessory… · 10 permits in this project (such as building, plumbing and heating) · Permit 13 117254
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5T, 0 of 85 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5T is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (1.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
8 active planning applications within 250 m (about a 3-minute walk): three under review, three approved, one waiting for a hearing date, one other. That's more than at most Toronto addresses (the typical address has 1).
- 1502 Spadina Ave · 132 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposed nine-storey mixed-use building with a residential gross floor area of 8,213 square metres, including 109 affordable rental units, and a non-residential gross floor area of 3,185 square metres.File 22 136133 STE 11 SA · submitted Apr 20, 2022 · City record - 2508 Spadina Ave · 139 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposed nine-storey mixed-use building with a residential gross floor area of 8,213 square metres, including 109 affordable rental units, and a non-residential gross floor area of 3,185 square metres.File 22 136133 STE 11 SA · submitted Apr 20, 2022 · City record - 3230 Augusta Ave · 158 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The hearing was postponed. A new date hasn't been published yet.
File A0508/25TEY · submitted Jun 30, 2025 - 4353 College St · 180 m awaySite Plan: City review of the design and layout of a new building
City planners approved the site plan, with conditions to meet before a building permit.
Proposal for site plan approval related to a five storey addition to existing hostel with portion of ground floor to be used as retailFile 18 111118 STE 20 SA · submitted Jan 29, 2018 · City record - 5355 College St · 182 m awaySite Plan: City review of the design and layout of a new building
City planners approved the site plan, with conditions to meet before a building permit.
Proposal for site plan approval related to a five storey addition to existing hostel with portion of ground floor to be used as retailFile 18 111118 STE 20 SA · submitted Jan 29, 2018 · City record - 6357 College St · 186 m awaySite Plan: City review of the design and layout of a new building
City planners approved the site plan, with conditions to meet before a building permit.
Proposal for site plan approval related to a five storey addition to existing hostel with portion of ground floor to be used as retailFile 18 111118 STE 20 SA · submitted Jan 29, 2018 · City record - 7309 Augusta Ave · 190 m awayOfficial Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Proposed six storey hotel with restaurant components containing 2194sqm of non-residential gross floor area. No parking is proposed.File 26 206718 STE 11 OZ · submitted Jul 22, 2026 · City record - 86 Nassau St · 206 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Jun 22, 2022. It has been appealed to the Toronto Local Appeal Body (TLAB), which will hold its own hearing and make the final decision.
To construct five four-storey townhouse dwellings.File A0250/21TEY · submitted Feb 28, 2021
29 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 299 Augusta Ave
Is 299 Augusta Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
Does 299 Augusta Ave have open fire code violations?
No. The City's fire inspection records show no violations in open inspections. Source: Residential Fire Inspection Results.
What is being built near 299 Augusta Ave?
There are 8 active planning applications within 250 metres (three under review, three approved, one waiting for a hearing date, one other). The closest is at 502 Spadina Ave, 132 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 299 Augusta Ave been renovated?
Yes. The City has 22 building permits on record, 7 in the last 5 years. Source: Building Permits.
Is 299 Augusta Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 299 Augusta Ave?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location