299 Chaplin Cres

299 Chaplin Cres is in Forest Hill South. It's outside TRCA flood hazard areas and there are 10 planning applications nearby (five under review, one refused, one deferred, three others).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 10 planning applications within 250 m: five under review, one refused, one deferred, three others.
Building permits0in the last 5 years
Applications nearby10active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
Eglinton AveSpadina RdVesta DrLatimer AveChaplin CresOrmsby CresChadwick AveDuncannon DrTarlton RdCollege View AveCastlewood RdGardiner RdHeddington AveWarren RdRussell Hill RdForest Hill Rd12345678910Map data: City of Toronto (Toronto Centreline)Eglinton AveSpadina RdLatimer AveChaplin CresOrmsby CresForest Hill RdBurnaby BlvdHeddington AveWarren RdRussell Hill Rd12345678910Map data: City of Toronto (Toronto Centreline)
The red dot is 299 Chaplin Cres. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 1 permit
  • Back Water Valve (Sewer only) · completed Sep 6, 2017
    Installation of backflow water valve. · Permit 17 226543

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5P0.7% of tests above Ontario's limitYour area · M5PNon Regulated Lead Sample · 153 tests, Mar 18, 2014 to Aug 5, 2026

In postal area M5P, 1 of 153 home tap-water samples (0.7%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5P is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.3%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

10 active planning applications within 250 m (about a 3-minute walk): five under review, one refused, one deferred, three others. That's more than at 9 in 10 Toronto addresses.

Nov
25
Nearby · 212 mCommittee of Adjustment hearing: 649 Spadina Rd3:00 p.m. · Committee of Adjustment · Minor variance · File A0710/26TEY
  1. 1
    570 Eglinton Ave W · 128 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Jul 26, 2018.

    To make interior and exterior alteration to the existing building resulting in seven new apartment units.
    File A0449/18NY · submitted Jun 13, 2018
  2. 2
    570 Eglinton Ave W · 128 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The hearing was postponed. A new date hasn't been published yet.

    To alter the existing apartment building by converting two non-residential spaces (retail unit and storage room) in the basement into two additional dwelling units.
    File A0368/25NY · submitted Aug 27, 2025
  3. 3
    23 Latimer Ave · 177 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Apr 20, 2017. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To construct a new three-storey dwelling. The existing dwelling would be demolished.
    File A0124/17NY · submitted Feb 10, 2017
  4. 4
    523 A Eglinton Ave W · 198 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for a 7-storey mixed-use building having a non-residential gross floor area of 348.84 square metres, and a residential gross floor area of 3972.82 square metres. A total of 35 residential dwelling units are proposed on the lot.
    File 21 120368 STE 12 SA · submitted Feb 25, 2021 · City record
  5. 5
    521 Eglinton Ave W · 205 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for a 7-storey mixed-use building having a non-residential gross floor area of 348.84 square metres, and a residential gross floor area of 3972.82 square metres. A total of 35 residential dwelling units are proposed on the lot.
    File 21 120368 STE 12 SA · submitted Feb 25, 2021 · City record
  6. 6
    515 Eglinton Ave W · 205 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for a 7-storey mixed-use building having a non-residential gross floor area of 348.84 square metres, and a residential gross floor area of 3972.82 square metres. A total of 35 residential dwelling units are proposed on the lot.
    File 21 120368 STE 12 SA · submitted Feb 25, 2021 · City record
  7. 7
    649 Spadina Rd · 212 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    A public hearing is set for Nov 25, 2026 at 3:00 p.m.. Neighbours can send comments or speak at the hearing.

    To construct a new front yard parking pad (abutting Spadina Road), and to widen the driveway (that does not lead directly to a garage). Minor Variance Decision A0488/25TEY approved a new three-storey detached dwelling with an integral…
    File A0710/26TEY · submitted Sep 25, 2026
  8. 8
    509 Eglinton Ave W · 214 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for a 7-storey mixed-use building having a non-residential gross floor area of 348.84 square metres, and a residential gross floor area of 3972.82 square metres. A total of 35 residential dwelling units are proposed on the lot.
    File 21 120368 STE 12 SA · submitted Feb 25, 2021 · City record
  9. 9
    507 Eglinton Ave W · 216 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposal for a 7-storey mixed-use building having a non-residential gross floor area of 348.84 square metres, and a residential gross floor area of 3972.82 square metres. A total of 35 residential dwelling units are proposed on the lot.
    File 21 120368 STE 12 SA · submitted Feb 25, 2021 · City record
  10. 10
    782 Spadina Rd · 220 m away
    Committee of Adjustment · Consent (severance): permission to split a lot or change property lines

    The Committee of Adjustment approved it on Jun 3, 2026.

    To obtain consent to sever the property into three undersized residential lots and to create new easements/rights-of-way.
    File B0077/25TEY · submitted Dec 17, 2025
Short-term rentals nearby1 registered homeWithin 250 mShort Term Rentals Registration

1 home within 250 m is registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorJosh MatlowWard 12councillor_matlow@toronto.ca · 416-392-7906

05Quick answers about 299 Chaplin Cres

Is 299 Chaplin Cres in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 299 Chaplin Cres?

There are 10 active planning applications within 250 metres (five under review, one refused, one deferred, three others). The closest is at 570 Eglinton Ave W, 128 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 299 Chaplin Cres been renovated?

Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.

Is 299 Chaplin Cres a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 299 Chaplin Cres?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

FIRE HALL, TORONTO, EGLINTON AVE. W., s. side, betw. Russell Hill Rd. & Chaplin Cres.; looking west at rear.
1955 · 98 m awayFIRE HALL, TORONTO, EGLINTON AVE. W., s. side, betw. Russell Hill Rd. & Chaplin Cres.; looking west at rear. Courtesy of Toronto Public Library
C.N.R., wreck, near Chaplin Crescent & Russell Hill Rd.
1946 · 103 m awayC.N.R., wreck, near Chaplin Crescent & Russell Hill Rd. Courtesy of Toronto Public Library
Construction of retaining wall on railway lands, Chaplin Cres. north of Eglinton Ave. W.
1955 · 122 m awayConstruction of retaining wall on railway lands, Chaplin Cres. north of Eglinton Ave. W.City of Toronto Archives, Fonds 207, Series 1251, Item 141
Parcel of land required to widen Chaplin Cres. at Eglinton Ave. W.
1945 · 122 m awayParcel of land required to widen Chaplin Cres. at Eglinton Ave. W.City of Toronto Archives, Fonds 207, Series 1251, Item 165
Parcel of land required to widen Chaplin Cres. at Eglinton Ave. W.
1945 · 122 m awayParcel of land required to widen Chaplin Cres. at Eglinton Ave. W.City of Toronto Archives, Fonds 207, Series 1251, Item 168
Parcel of land required to widen Chaplin Cres. at Eglinton Ave. W.
1945 · 122 m awayParcel of land required to widen Chaplin Cres. at Eglinton Ave. W.City of Toronto Archives, Fonds 207, Series 1251, Item 169
Eglinton Ave. W., looking w. from Chaplin Crescent.
1955 · 122 m awayEglinton Ave. W., looking w. from Chaplin Crescent. Courtesy of Toronto Public Library
Parcel of land required to widen Chaplin Cres. at Eglinton Ave. W.
1945 · 122 m awayParcel of land required to widen Chaplin Cres. at Eglinton Ave. W.City of Toronto Archives, Fonds 207, Series 1251, Item 166
Construction of retaining wall on railway lands, Chaplin Cres. north of Eglinton Ave. W.
1955 · 122 m awayConstruction of retaining wall on railway lands, Chaplin Cres. north of Eglinton Ave. W.City of Toronto Archives, Fonds 207, Series 1251, Item 142