Skip to content
My Address in Toronto
Address report

3 Major St

3 Major St is in University. It's outside TRCA flood hazard areas and there are 4 planning applications nearby (two under review, one under appeal after a refusal, one deferred).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood hazard areas.
  • 4 planning applications within 250 m: two under review, one under appeal after a refusal, one deferred.
Building permits0in the last 5 years
Applications nearby4active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 10garbage, green bin and yard waste
Spadina AveCollege StBathurst StSpadina CresRobert StOxford StBrunswick AveAugusta AveBellevue AveVankoughnet StMajor StLippincott StRussell StBorden StHuron StCecil StUrsula Franklin StGlasgow St1234Map data: City of Toronto (Toronto Centreline)Spadina AveCollege StSpadina CresOxford StBrunswick AveAugusta AveBellevue AveMajor StRussell St1234Map data: City of Toronto (Toronto Centreline)
The red dot is 3 Major St. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record

0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 1 permit
  • Party Wall Admin Permits · completed Jul 23, 2024
    Party wall administration permit in relation to construction at 1-1/2 Major Street (file 18-230986). · Permit 18 242868

04Risks and the ground

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M5S0% of tests above Ontario's limitYour area · M5SNon Regulated Lead Sample · 167 tests, May 6, 2014 to Aug 11, 2026

In postal area M5S, 0 of 167 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5S is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 5 samples here (3.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

4 active planning applications within 250 m (about a 3-minute walk): two under review, one under appeal after a refusal, one deferred. That's about typical for Toronto (the typical address has 1).

  1. 1
    57 Major St · 157 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Oct 2, 2020. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To legalize and maintain the basement secondary suite in the existing three-storey, two-unit townhouse.
    File A0395/20TEY · submitted Apr 24, 2020
  2. 2
    508 Spadina Ave · 181 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed nine-storey mixed-use building with a residential gross floor area of 8,213 square metres, including 109 affordable rental units, and a non-residential gross floor area of 3,185 square metres.
    File 22 136133 STE 11 SA · submitted Apr 20, 2022 · City record
  3. 3
    46 Russell St · 185 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The hearing was postponed. A new date hasn't been published yet.

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition, rear and side (west) balconies on the second and third storeys, and a side (west) basement window well. There will be a…
    File A0643/25TEY · submitted Aug 5, 2025
  4. 4
    502 Spadina Ave · 192 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Proposed nine-storey mixed-use building with a residential gross floor area of 8,213 square metres, including 109 affordable rental units, and a non-residential gross floor area of 3,185 square metres.
    File 22 136133 STE 11 SA · submitted Apr 20, 2022 · City record
Short-term rentals nearby34 registered homesWithin 250 mShort Term Rentals Registration

34 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at almost all Toronto addresses.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingTuesdaysThis addressSolid Waste Collection Schedule

Next: November 10: garbage, green bin and yard waste. November 17: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorDianne SaxeWard 11Councillor_Saxe@toronto.ca · 416-392-4009

05Quick answers about 3 Major St

Is 3 Major St in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 3 Major St?

There are 4 active planning applications within 250 metres (two under review, one under appeal after a refusal, one deferred). The closest is at 57 Major St, 157 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 3 Major St been renovated?

Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.

Is 3 Major St a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 3 Major St?

Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 10, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Billboards, College Street at Robert Street
1922 · 79 m awayBillboards, College Street at Robert StreetCity of Toronto Archives, Fonds 1244, Item 2536
Robert St looking north from College St : The greatest show of poles. This is one of my photos that helped to win a first prize of $25 for the best photos of poles and wires on Toronto streets.
1911 · 79 m awayRobert St looking north from College St : The greatest show of poles. This is one of my photos that helped to win a first prize of $25 for the best photos of poles and wires on Toronto streets. City of Toronto Archives, Fonds 1244, Item 7108
Robert St looking north from College St : The greatest show of poles. This is one of my photos that helped to win a first prize of $25 for the best photos of poles and wires on Toronto streets.
1911 · 79 m awayRobert St looking north from College St : The greatest show of poles. This is one of my photos that helped to win a first prize of $25 for the best photos of poles and wires on Toronto streets. City of Toronto Archives, Fonds 1244, Item 7108a
View of College Street looking west across Brunswick Avenue
1983 · 132 m awayView of College Street looking west across Brunswick AvenueCity of Toronto Archives, Fonds 1526, File 71, Item 96
College Street, north side, looking north from Brunswick or Bellevue Avenue
1960 · 150 m awayCollege Street, north side, looking north from Brunswick or Bellevue AvenueCity of Toronto Archives, Fonds 1257, Series 1057, Item 5556
College Street, looking west from east of Brunswick or Bellevue Avenue
1960 · 150 m awayCollege Street, looking west from east of Brunswick or Bellevue AvenueCity of Toronto Archives, Fonds 1257, Series 1057, Item 5555
St. Stephen's-In-The-Fields Anglican Church, Bellevue Ave., s.e. corner College St.
1889 · 169 m awaySt. Stephen's-In-The-Fields Anglican Church, Bellevue Ave., s.e. corner College St. Courtesy of Toronto Public Library
Fire Hall, College Street and Bellevue Avenue
1968 · 169 m awayFire Hall, College Street and Bellevue AvenueCity of Toronto Archives, Fonds 124, File 2, Item 29
St. Stephen's-in-the-fields Anglican church, Bellevue Ave., s.e. corner College St.
1908 · 169 m awaySt. Stephen's-in-the-fields Anglican church, Bellevue Ave., s.e. corner College St. Courtesy of Toronto Public Library

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

3 Major St, Toronto M5S: permits, flood risk and what's planned nearby · My Address in Toronto