3 Maribeth Ave
3 Maribeth Ave is in Cabbagetown-South St.James Town. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (all under review).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: all under review.
03The building
0 building permits in the last 5 years. Together they added 1 new home. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 5 permits
- New Building · completed Dec 12, 2019
Proposed construction of a 3-storey semi-detached dwelling and demolition of existing semi-detached dwelling. · 4 permits in this project (such as building, plumbing and heating) · Permit 18 155696 - Demolition · completed Apr 5, 2019
Proposed construction of a 3-storey semi-detached dwelling and demolition of existing semi-detached dwelling. · Permit 18 155760
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4Y, 0 of 23 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): all under review. That's about typical for Toronto (the typical address has 1).
- 1410 Sherbourne St · 178 m awayCondominium: a request to divide a building into condominium units
City planners are reviewing it. Residents can comment before a decision is made.
*** Proposed Draft Plan of Condominium for a 39-storey mixed-use building containing 456 residential units.File 21 235374 STE 13 CD · submitted Nov 8, 2021 · City record - 2410 Sherbourne St · 178 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Approval Application for a 42-storey mixed-use building having a non-residential gross floor area of 240 square metres and a residential gross floor area of 31,273 square metres.File 21 235164 STE 13 SA · submitted Nov 7, 2021 · City record - 3405 Sherbourne St · 199 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Control Application for a 35-storey (112.6) metre building (excluding mechanical penthouse) 25,069 square metres of residential gross floor area and 388 square metres of non-residential gross floor area and a landscaped…File 26 126970 STE 13 SA · submitted Mar 9, 2026 · City record
10 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 11: recycling and green bin. November 18: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 3 Maribeth Ave
Is 3 Maribeth Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 3 Maribeth Ave?
There are 3 active planning applications within 250 metres (all under review). The closest is at 410 Sherbourne St, 178 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 3 Maribeth Ave been renovated?
Yes. The City has 5 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 3 Maribeth Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 3 Maribeth Ave?
Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives









Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location